Zoryra Zoryra Forum Sign in

Zoryra Forum

Quantities, lead time, and what a drawing needs before a price.

Currency and a price they forwarded to their customer Solved We quoted in our currency, EXW, 30 days. The buyer forwarded our number to their customer as a delivered pric… Zoryra Forum · Lead · 3 replies · 0 views · Minimum order when the part is one insert and a hole Solved The part is a washer with two holes. They want four pieces, material certificate, and a full dimensional repo… Zoryra Forum · Lead · 3 replies · 0 views · Cosmetic faces that are not on the drawing Solved The model has no cosmetic map. The buyer rejected a part for a vise mark on a face that is not a datum and no… Zoryra Forum · Lead · 3 replies · 0 views · Tooling charge the buyer wants refunded after one order We charged a fixture as a separate line, owned by us, which the quote stated. After one order of 30 pieces th… Zoryra Forum · Lead · 3 replies · 0 views · A CAD model that does not match the PDF Solved The STEP and the PDF differ by a missing groove. The buyer said 'machine the model' in email and the PO cites… Zoryra Forum · Lead · 3 replies · 0 views · Blanket order with releases that are always rush Solved A blanket for a year, price based on monthly releases of 100. Every release so far is 20 pieces, due in five… Zoryra Forum · Lead · 3 replies · 0 views · Anodize called out, and the thickness stacks on a fit Solved A sliding fit is ±0.02 before anodize. The print also says black anodize. Nobody said whether the fit is befo… Zoryra Forum · Lead · 3 replies · 0 views · Missing thread class on a 'standard' metric hole Solved The print says M8 in a table and does not give a class. We assumed 6H. The gauge they used on incoming is a t… Zoryra Forum · Lead · 3 replies · 0 views · Prototype price versus a production promise We cut three prototypes at a high unit price because the fixture did not exist. The buyer now wants 200 at th… Zoryra Forum · Lead · 3 replies · 0 views · Shipping terms that were never in the piece price Solved We quoted EXW. The buyer's PO says 'freight included, your account, to the dock' and uses our unit price. The… Zoryra Forum · Lead · 3 replies · 0 views · A ±0.01 profile on a welded frame Solved The weldment print has a profile tolerance of 0.01 on pads that are 400 mm apart. The buyer wants a machining… Zoryra Forum · Lead · 3 replies · 0 views · Hardware inserts the buyer thinks are included Solved The print shows pressed helical inserts. The buyer believes the unit price includes buying and installing the… Zoryra Forum · Lead · 3 replies · 0 views · Surface finish callout of Ra 0.4 on a milled floor Solved A pocket floor is called out Ra 0.4 and the rest of the part is ordinary machining. Hitting 0.4 on that floor… Zoryra Forum · Lead · 3 replies · 0 views · Inspection level that doubles the price The RFQ says 'inspect all dimensions 100 percent and supply a report.' The part has forty dimensions, ten pie… Zoryra Forum · Lead · 3 replies · 0 views · A note that says 'deburr and break edges' with no size Solved The print's only finish note is 'deburr all edges and break sharp corners.' The buyer later rejected a 0.5 mm… Zoryra Forum · Lead · 3 replies · 0 views · Lead time when the material is not on the shelf Solved The buyer wants two weeks. The material is 17-4 in a size we do not stock, and the mill says three weeks. The… Zoryra Forum · Lead · 3 replies · 0 views · Quantity breaks that do not cover the setup Solved We quoted 10, 50, and 100 pieces with a setup amortized per part. The buyer ordered 12 and expects the 100-pi… Zoryra Forum · Lead · 3 replies · 0 views · What has to be on a drawing before you will price a turned pin? Solved A buyer sent a photo of a pin and a quantity of 500. No tolerance, no material, no finish. They want a number… Zoryra Forum · Lead · 3 replies · 0 views ·