Standar khas ~10 dina (prod + sketsa udara) · Ekspres ~6 dina · gambar / DFM

Zoryra Precision

Bagian peralatan pendinginan AI

Iki minangka bagean peralatan pendinginan AI: piring adhem, manifold, lan bracket. Bahan aluminium kajaba gambar mbutuhake tembaga. Apa wae sing diarani gambar kasebut. Wektu timbal standar kanthi finish udakara 8–10 dina.

  • Thermal flatness
  • Masking notes
  • Pilot → small batch
  • Opsi inspeksi
Bagian peralatan pendinginan AI

AI hardware buyers iterate cold plates, stiffeners, and connector panels under thermal + EMI constraints. We quote aluminum / copper paths with finish days on the production clock.

Scope: metal structures and fixtures for AI gear — we do not sell AI models or claim “AI quoting.” Factory visit and QA docs remain optional as elsewhere on the site.

Why choose Zoryra · Bagian peralatan pendinginan AI

Typical parts

Liquid / air cold plates & heat spreaders · GPU / accelerator retention brackets · Optical-module & transceiver housings · Server rail / stiffener plates

Tolerance guidance

Thermal flatness often 0.05–0.1 mm over contact zones; connector cutouts ±0.05–0.1 mm. Drawing governs — optional CMM / FAI in quote.

Watch-outs

Thermal flatness · Masking notes · Pilot → small batch · Opsi inspeksi

Typical parts

  • Liquid / air cold plates & heat spreaders
  • GPU / accelerator retention brackets
  • Optical-module & transceiver housings
  • Server rail / stiffener plates

Tolerance guidance

Thermal flatness often 0.05–0.1 mm over contact zones; connector cutouts ±0.05–0.1 mm. Drawing governs — optional CMM / FAI in quote.

Watch-outs

  • Keep anodize / plating off thermal faces unless drawn
  • Call out copper vs aluminum early (lead & cost differ)
  • Share coolant / sealing notes if ports are machined

Related

FAQ

Apa sampeyan nyedhiyakake latihan piranti lunak utawa model AI?

Ora — kaca iki kanggo bagean logam CNC sing digunakake ing hardware AI. Ngunggah langkah kanggo penawaran mesin.

Wektu timbal khas kanggo piring adhem?

Standar ≈ 8–10 dina referensi karo finish (produksi + sketsa udara). Ngungkapake nalika kosong + cahya rampung ngidini.

Upload CAD for an itemized reference

AI Instant Reference Quote + engineering review within 12 business hours.

Other industries

AIQuoteEmail
PDF

Email kerja sing disenengi ([email protected]). Mail pribadi ora apa-apa. Opsional — download isih bisa.

Kita bakal nggunakake email karya iki mung kanggo ngirim item iki lan kanggo njawab pitakonan engineering (quote, wektu timbal, gambar).

AI cooling bagean CNC | aluminium piring kadhemen, flatness ing gambar, bab 10 dina