STEP / STL / IGES — preview before sign-in.
Zoryra Precision
5-Axis CNC di Dongguan, Cina | Zoryra Precision
Zoryra Precision 5 sumbu ing Dongguan, China: pasuryan kompleks, bagean multi-sisi, kurang setelan. NDA lan CMM opsional. Ora kritis penerbangan kanthi default. Ora ana nomer AS/ISO sing ditemokake.
- Setelan sing luwih sithik
- Lumahing Komplek
- Insinyur cadangan
- FAI / CMM opsional

Three steps to start
Material, qty, finish, lead tier, inspection.
Escalate complex jobs; Dongguan, China produce & ship.
Lead time split
Express reference ≈ 3 days production + 3 days shipping sketch ≈ 6 days total. Standard ≈ 10 days. Quotes always show production and shipping separately.
Long-tail use cases
Common quote paths: robotics EOAT with compound angles, UAV arm connectors, AI cold plates / GPU brackets, electronics housings with undercuts, and non-implant medical interfaces — see industry pages + problem guides, then upload STEP.
When 5-axis helps
Compound angles, deep undercuts reachable in one setup, and organic surfaces that are costly on 3-axis. We still recommend 3-axis when it is cheaper after DFM.
Quality docs & privacy
CAD privacy / NDA options, dimensional reports, FAI, and CMM on request. Factory-direct Dongguan, China. Certification details are shared when available for qualified buyers.
Datum & inspection
Define datum schemes clearly. Fine targets around ±0.002 mm / down to 0.001 mm capability are common with optional CMM / dimensional reports selected in the quote.
Category depth
Pair this page with materials & finishes, industries, milling, and turning hubs — same transparent quote engine everywhere.
Engineering review
5-axis jobs often need DFM alignment — live chat or email within 12 business hours. Large STEP files belong in Upload for quote.
Capability specs & DFM
| Item | Spec |
|---|---|
| PANASONIC | Lumahing kompleks, bagean multi-muka, kurang setelan |
| Target toleransi | ±0,002 mm target apik umum karo cek CMM |
| MATERIAL | Aluminium, stainless, baja alat, plastik |
| MIN FEATURE | Dhiameter alat & tekan winates — nuduhake langkah awal |
| DFM tip | Netepake skema datum kanthi jelas; ngindhari permukaan bebas sing toleran banget |
Sapa sing mesin, lan ngendi
Bagéan kasebut minangka pabrik langsung saka Dongguan Zerui Precision Manufacturing Co., Ltd. ing Dongguan, China, Guangdong. Merek metu: ZORYRA / Zoryra Precision.
Saka 1 pc. Sawise upload CAD sampeyan njaluk referensi rinci AI; pesenan tenan tindakake gambar lan simpul pembayaran sing disepakati. Kita ora ngirim foto tanduran pihak katelu minangka baris kita.
Kaca iki ora nuduhake nomer ISO / AS / FDA sing ditemokake. Sistem sing kita ora duwe ora ditulis kaya sing dicekel. Kunjungan pabrik bisa diatur.
Zoryra Precision 5 sumbu ing Dongguan, China: pasuryan kompleks, bagean multi-sisi, kurang setelan. NDA lan CMM opsional. Ora kritis penerbangan kanthi default. Ora ana nomer AS/ISO sing ditemokake.
Wajah kompleks lan bagean multi-sisi nggunakake 5 sumbu kanggo nglereni setelan. Aja ngliwati permukaan sing bebas toleransi; nulis datum lan ngirim langkah awal. Ora kritis penerbangan kanthi default.
Bagian tipikal
- POSTERS PREACH
- Lumahing Komplek
- Struktur setelan sing luwih sithik
- PANASONIC
- Impeller-adjacent (ora kritis penerbangan)
- LAN Interface
Bahan & finishing
- 7075 — dhuwur-kekuwatan, kurang setelan
- 6061 — komplèks housings
- 304 — multi-face stainless, passivate
- POSTERS PREAC — plastik Teknik Multi-Face
DFM: skema datum, permukaan gratis, setelan
- Tulis skema datum; aja over-tolerance lumahing free
- Alat REVIEW REACH
- Mark clamp pasuryan lan tetep metu ing model
- CMM minangka ticked — ora standar scan ukuran lengkap
Inspeksi lan dokumen (kaya sing dicenthang)
- Dimensional report as ticked
- Biyuh, biyuh.
- CMM minangka ticked
- Sertifikat bahan saben perjanjian pesenan
Wektu utama (jam diwiwiti ing simpul pembayaran)
Tier utama: Ekonomi / Standar / Ekspres. Standar udakara 10 dina kerja minangka referensi; Nuduhake udakara 6 yen kapasitas ngidini.
Jam diwiwiti ing simpul pembayaran sing disepakati. Anodize, wêdakakêna, passivate, lan outsourced panas-perawatan dina lungguh ing jam sing.
Titanium, hard-coat kandel, sisipan, lan gauges kompleks re-jam. Sketsa kutipan ngatur.
Apa sing ora kita lakoni
- Ora kritis penerbangan utawa ITAR kanthi default
- Ora ditemokake AS/ISO
- Implantasi ing njaba ruang lingkup
- Ora saben bagean sing digiling nganggo sumbu 5
FAQ
Apa sampeyan dhaptar nomer ISO / AS / FDA ing kene?
Ora ana nomer sing ditemokake. Sistem sing ora dicekel ora ditulis kaya sing dicekel. Kunjungan pabrik bisa diatur.
Apa sampeyan njupuk 1 pc?
Ya. Sawise CAD sampeyan njaluk referensi rinci AI; pesenan tenan tindakake gambar lan simpul pembayaran.
Kapan jam timbal diwiwiti?
Ing simpul pembayaran sing disepakati. Anodize, bubuk, dina passivate lungguh ing jam. Tingkat ing penawaran: Ekonomi / Standar / Ekspres.
Apa 5 sumbu minangka default?
Ora. Kita ngevaluasi nalika fitur perlu kurang setelan utawa pasuryan Komplek.
Bagéan-bagéan sing penting kanggo mabur?
Ora kanthi default. Lingkup bakal dadi persetujuan kapisah — lan kita ora nemokaké nomer AS.
Is every complex part a 5-axis job?
Not always — some parts are cheaper with smart 3-axis setups. We recommend the economical path after DFM.
What does ~6 days express mean?
A reference split: production + international shipping sketch for the Express tier. Actual dates depend on material, finish, queue, and carrier — shown itemized on your quote.
Do you show ISO certificates on this landing?
Only when a verifiable copy is available for qualified buyers. We emphasize NDA, inspection options, and factory-direct service.
What is 5-axis CNC machining?
The tool or table moves in five degrees of freedom so complex faces can be reached in fewer setups than 3-axis — useful for compound angles and organic surfaces.
What travel / envelope should I expect?
Envelope depends on the assigned machine after DFM. Share overall size early; oversized parts are reviewed before acceptance.
Why does 5-axis often cost more?
Programming, fixtures, and spindle time are higher — but fewer setups can reduce total cost vs multi-setup 3-axis. We recommend the cheaper valid path after DFM.
Which finishes work on 5-axis parts?
Same atlas as milling: as-machined, blast, anodize (Al), passivate (SS), powder, polish. Finish days add to the production clock — see Materials & finishes.
What files work best?
Native STEP preferred so we can evaluate tool access; PDF drawings for GD&T and notes.
Other capabilities
Upload CAD for an itemized reference
AI Instant Quote + engineer backup in business hours. No 3D printing / injection / die casting.
