Coitcheann àbhaisteach ~ 10 latha (prod + sgeidse adhair) · Cuir an cèill ~ 6 latha · tarraing / DFM

Automotive & EV Machining

Quotes separate Dongguan, China production days and international shipping sketches.

Good fit: jigs, go/no-go fixtures, battery tray brackets, sensor mounts.

Why choose Zoryra · Automotive & EV Machining

Typical parts

Jigs & fixtures · Battery tray brackets · Sensor mounts · Cooling brackets

Tolerance guidance

Fixture datums often ±0.02–0.05 mm; prototype cosmetic parts looser unless drawn tighter.

Watch-outs

Piloted lead times · Material grades · Coatings · Pilot quantities

Typical parts

  • Jigs & fixtures
  • Battery tray brackets
  • Sensor mounts
  • Cooling brackets

Tolerance guidance

Fixture datums often ±0.02–0.05 mm; prototype cosmetic parts looser unless drawn tighter.

Watch-outs

  • State material grade + coating on RFQ
  • Pilot qty and reorder rhythm
  • Certifications shared when verified

Related

Upload CAD for an itemized reference

AI Instant Reference Quote + engineering review within 12 business hours.

Other industries

Robotics & automationCustom CNC for cobot cells from Dongguan, China: typical parts, datums, inserts, anodize masking, Standard ~10 days reference — not just an industry tag.MedicalNon-implant instrument structures from Dongguan, China: housings, lab fixtures, surgical-instrument metal parts — QA docs optional, honest scope, no invented certs.Pàirtean droneIs iad sin pàirtean drone: motaran motair, ceanglaichean gàirdean, camagan gimbal, agus treallaich bataraidh. Is e an stuth àbhaisteach 6061 aluminium, no 7075 nuair a dh'iarras an dealbh. Bidh fulangas agus aghaidhean suirghe a’ leantainn an dealbh. Tha an ùine stiùiridh àbhaisteach timcheall air 8-10 latha airson 1-50 pìosan.Electronics & semiconductorMetal around electronics and semiconductor equipment — heat spreaders, EMI, optics housings — not a wafer fab or cleanroom contractor.Pàirtean uidheamachd fuarachaidh AIIs iad sin pàirtean uidheamachd fuarachaidh AI: truinnsearan fuar, manifolds, agus camagan. Is e alùmanum a th’ ann an stuth mura h-eil an dealbh ag iarraidh copar. Is e rèidh ge bith dè a chanas an dealbh. Tha an ùine stiùiridh àbhaisteach le crìochnachadh timcheall air 8-10 latha.Laser equipment partsIs iad sin pàirtean uidheamachd laser: sreapadairean, suidheachain nozzle, sgeadachadh optic, agus lannan bonn. Is e stuthan cumanta 6061 alùmanum agus stainless. Bidh fulangas, a’ gabhail a-steach rèidh an t-suidheachain optic, a’ leantainn an dealbh. Tha an ùine stiùiridh àbhaisteach timcheall air 8-10 latha. Chan e laser crìochnaichte a tha seo.
AithrisAIEmail
PDF

B’ fheàrr le post-d obrach ([email protected]). Tha post pearsanta ceart gu leòr. Roghainneil - tha an luchdachadh sìos fhathast ag obair.

Cleachdaidh sinn am post-d obrach seo a-mhàin gus an rud seo a chuir air falbh agus airson do cheistean innleadaireachd a fhreagairt (cuing, ùine stiùiridh, dealbhan).

CNC Parts for Automotive & EV Programs