Typical Standard ~10 days (prod + air sketch) · Express ~6 days · drawing / DFM

Aluminum

7075 Aluminum CNC in Dongguan, China | Zoryra Precision

AKA: Al7075-T6 / EN-AW7075

High strengthFatigue resistantMachines well

7075 is a high-strength aluminum for structures, fixtures, and fatigue duty. Machines well; often anodized. Welding is limited — call out temper on the drawing.

Aluminum 7075

Key traits

  • High strength
  • Fatigue resistant
  • Machines well

Available processes

CNC machiningRapid proto

Typical applications

  • Structural brackets
  • Robot EOAT parts
  • Fixtures
  • Aerospace-adjacent structures (non-flight-critical by default)

Common finishes

  • Anodize (Type II / hard coat on request)
  • Bead blast
  • Brush

Who machines it, and where

Parts are factory-direct from Dongguan Zerui Precision Manufacturing Co., Ltd. in Dongguan, China, Guangdong. Outward brand: ZORYRA / Zoryra Precision.

From 1 pc. After CAD upload you get an AI itemized reference; firm orders follow the drawing and the agreed payment node. We do not pass off third-party plant photos as our line.

This page shows no invented ISO / AS / FDA numbers. Systems we do not hold are not written as held. Factory visits can be arranged.

Zoryra Precision 7075-T6 in Dongguan, China: high-strength structures, fixtures, fatigue duty. Mill and anodize. Welding limited. Not flight-critical by default. No invented ISO.

Dongguan, China 7075-T6: high-strength structures, fixtures, fatigue duty. Mill and anodize (hard coat as ticked). Welding limited. Not flight-critical by default. From 1 pc.

Typical parts

  • Structural brackets
  • Fixture bodies
  • Robot EOAT-adjacent
  • Fatigue plates
  • Hard-coat structures
  • Aerospace-adjacent (not flight-critical)

Materials & finishes

  • 7075-T6 — high-strength stock
  • Hard coat — as ticked, on the lead clock
  • 6061 — workhorse housings on its page
  • Titanium — separate review, re-clocks

DFM: temper, limited welding, hard coat

  • Call temper (T6 common)
  • Welding is limited — agree seams early
  • Call hard-coat thickness vs fits
  • Not flight-critical by default

Inspection and documents (as ticked)

  • Dimensional report as ticked
  • FAI as ticked
  • CMM as ticked
  • Material certs per order agreement

Lead time (clock starts at the payment node)

Lead tiers: Economy / Standard / Express. Standard is about 10 working days as a reference; Express about 6 when capacity allows.

The clock starts at the agreed payment node. Anodize, powder, passivate, and outsourced heat-treat days sit on that clock.

Titanium, thick hard-coat, inserts, and complex gauges re-clock. The quote sketch governs.

What we don’t do

  • Not flight-critical or ITAR by default
  • Welding limited
  • No invented AS/ISO
  • Thick hard-coat re-clocks

FAQ

Do you list ISO / AS / FDA numbers here?

No invented numbers. Systems we do not hold are not written as held. Factory visits can be arranged.

Do you take 1 pc?

Yes. After CAD you get an AI itemized reference; firm orders follow the drawing and payment node.

When does the lead clock start?

At the agreed payment node. Anodize, powder, passivate days sit on the clock. Tiers on the quote: Economy / Standard / Express.

Can 7075 take hard coat?

Yes, as ticked — call thickness vs fits; days sit on the clock.

Flight-critical by default?

No. Scope would be a separate agreement — we do not invent AS numbers.

Grade and lead follow the quote options. Call out critical tolerances, temper, and masking on the drawing/notes. Material certs selectable on the quote.

Quote with Aluminum 7075

Upload CAD with this grade preselected — set finish and inspection on the quote.

Get AI Instant Quote
AIQuoteEmail
PDF

Work email preferred ([email protected]). Personal mail is OK. Optional — the download still works.

We’ll use this work email only to send this item and to answer your engineering questions (quote, lead time, drawings).

7075 Aluminum CNC Dongguan, China | Structures Fixtures Anodize | Zoryra