Typical Standard ~10 days (prod + air sketch) · Express ~6 days · drawing / DFM

Zoryra Precision

How to order CNC: quote, pay, lead time

Zoryra Precision order path: upload CAD, AI itemized reference, engineer review, then schedule after the agreed payment node. Economy / Standard / Express; finish days sit on the clock. No invented ISO.

Start AI Instant Quote

1) Upload your CAD

Drag STEP/STL into AI Instant Quote. Guest preview works before login.

Learn & start →

2) Get an AI itemized reference quote

AI speeds feature recognition and cost breakdown — material, machining, setup, finish days, and lead-time tier — line by line.

Learn & start →

3) Escalate only where risk is real

Fit-critical, 5-axis, or inspection-heavy jobs can move to engineer confirmation within business hours — then place the order.

Learn & start →

4) Produce & ship globally

Factory-direct machining with production days and logistics days shown separately on every AI reference quote.

Learn & start →

Who machines it, and where

Parts are factory-direct from Dongguan Zerui Precision Manufacturing Co., Ltd. in Dongguan, China, Guangdong. Outward brand: ZORYRA / Zoryra Precision.

From 1 pc. After CAD upload you get an AI itemized reference; firm orders follow the drawing and the agreed payment node. We do not pass off third-party plant photos as our line.

This page shows no invented ISO / AS / FDA numbers. Systems we do not hold are not written as held. Factory visits can be arranged.

The Dongguan, China order path is explicit: upload STEP + PDF, get an AI itemized reference; engineering reviews features; the lead clock starts at the agreed payment node.

Tiers: Economy / Standard / Express. Standard ≈ 10 working days reference; Express ≈ 6 when capacity allows. Anodize, powder, passivate days sit on that clock.

Firm orders follow the drawing, not a screenshot of the reference. From 1 pc. Factory visits can be arranged. No invented ISO / AS / FDA on this page.

Typical parts

  • Upload STEP + PDF
  • AI itemized reference
  • Engineer review
  • Agreed payment node
  • Schedule
  • Finishing
  • Inspection as ticked
  • Ship

Materials & finishes

  • STEP + PDF — minimum RFQ input
  • Material grade — on drawing or RFQ
  • Lead tier — Economy / Standard / Express
  • Payment node — clock starts here

DFM: drawing, tolerances, masking, pack

  • Call datums and tolerance frames on the drawing
  • Write thread standards in full
  • Mark anodize masking
  • Pack and rust-prevent notes on drawing or PO

Inspection and documents (as ticked)

  • Dimensional report as ticked
  • FAI as ticked
  • CMM as ticked
  • Material certs per order agreement

Lead time (clock starts at the payment node)

Lead tiers: Economy / Standard / Express. Standard is about 10 working days as a reference; Express about 6 when capacity allows.

The clock starts at the agreed payment node. Anodize, powder, passivate, and outsourced heat-treat days sit on that clock.

Titanium, thick hard-coat, inserts, and complex gauges re-clock. The quote sketch governs.

What we don’t do

  • No injection-mold tooling
  • No 3D-print production volumes
  • No third-party plant photos as our line
  • No invented ISO / AS / FDA

FAQ

Do you list ISO / AS / FDA numbers here?

No invented numbers. Systems we do not hold are not written as held. Factory visits can be arranged.

Do you take 1 pc?

Yes. After CAD you get an AI itemized reference; firm orders follow the drawing and payment node.

When does the lead clock start?

At the agreed payment node. Anodize, powder, passivate days sit on the clock. Tiers on the quote: Economy / Standard / Express.

Is the AI quote a contract?

No. It is an itemized reference; firm orders follow the drawing and the agreed payment node.

Can you schedule before payment?

The lead clock starts at the agreed payment node. Before that node we do not start the production clock.

AIQuoteEmail
PDF

Work email preferred ([email protected]). Personal mail is OK. Optional — the download still works.

We’ll use this work email only to send this item and to answer your engineering questions (quote, lead time, drawings).

CNC Order Flow | Quote to Ship | Clock from Payment | Zoryra