Adaty Standart ~10 gün (önüm + howa çyzgy) · Express ~6 gün · çyzgy / DFM

Zoryra Precision

Drone bölekleri

Bular dron bölekleri: motor montajlary, el baglaýyşlary, gimbal möçberleri we bataryýa gaplary. Adatça, 6061 alýuminium, ýagny 7075 sany suratlandyrylýar. Çykyşyň yzyndan çydamlylyk we çydamlylyk ýüzleri gelýär. Standart öndürme wagty 1-50 parçalar üçin takmynan 8-10 gün.

  • Weight targets
  • Thin-wall notes
  • Anodize color + masking
  • 1–50 pc batches
Drone bölekleri

UAV buyers iterate fast on motor mounts, gimbal brackets, arm connectors, and battery rails. Share mass targets and mating faces early — we flag thin-wall and anodize risks in DFM before chips fly.

Material path: Al6061-T6 for most structures; 7075 when strength per gram matters (motor mounts, landing gear). Finish: clear / black anodize common; mask threads and arm mating faces unless drawn.

Process: 3-axis pocketing for most brackets; 5-axis when compound arm angles or undercuts reduce setups. Standard tier ≈ 10 days reference (production + air sketch) with anodize on the clock.

See anonymized cases below — arm connector, motor mount, gimbal bracket, battery tray — then upload STEP for an itemized reference quote.

Why choose Zoryra · Drone bölekleri

Typical parts

Brushless motor mounts (M2/M3 patterns) · Gimbal / camera damping brackets · Arm-to-frame connectors · Battery tray slide rails & latches

Tolerance guidance

Structural mounting ±0.05 mm typical; bearing / shaft bores per drawing (H7 common); flat damping faces 0.05–0.1 mm when called out. Drawing governs.

Watch-outs

Weight targets · Thin-wall notes · Anodize color + masking · 1–50 pc batches

Typical parts

  • Brushless motor mounts (M2/M3 patterns)
  • Gimbal / camera damping brackets
  • Arm-to-frame connectors
  • Battery tray slide rails & latches
  • Landing gear blocks & prop guards
  • FPV / payload adapter plates

Tolerance guidance

Structural mounting ±0.05 mm typical; bearing / shaft bores per drawing (H7 common); flat damping faces 0.05–0.1 mm when called out. Drawing governs.

Watch-outs

  • Mark anodize color + keep-out mating faces
  • Thin walls ≥1.2 mm after pocketing unless DFM approved
  • 1–50 pc pilot batches — share reorder rhythm
  • 7075 vs 6061: call out early (cost & lead differ)

Typical UAV parts (anonymized)

Material · möhüm çäklendirmeler · dogry CNC gerimi. Bir iş üçin karta açyň ýa-da sitata STEP ýükleň. Suratlar bölek şekilleri bolup, üçünji tarapyň zawod suratlary däl.

Related

FAQ

Motor ýerleýjiler üçin 6061 ýa-da 7075?

Köpçülikleýin quadkopter ýerleýjiler üçin 6061; gram boýunça güýç ýa-da sapag çekilmesi möhüm bolsa 7075 — takyk alyş wagty we çykdajyny anyk görkezmek üçin RFQ-de belläň.

Daşynyşdirma ýüzlerini örtmeden anodiz edip bolar öýdýärmi?

Hawa — PDF-de “keep-out” ýüzlerini belläň; ölçegler we gol interfeyslere anodiz etmeden ozal mask salýarys, diagramma başga bir zat görkezmedikçe.

12–20 parçalyk UAV bracketleri üçin adaty alyş wagty näçe?

Standart ≈ 8–10 gün, açyk/gara anodiz bilen (önümçilik + howa çyzgy). Dirençler taýýarlyk bilen hossarly we gutarma ýönekeý bolsa tizleşdirilip biler.

Siz birleşdirilen burç burçlaryny goldaýýarmy?

Hawa — STEP faýlyny ýükläň; DFM-de aşak goýmalar ýa-da birleşdirilen burçlar köplenç birnäçe düzümleri talap etse 3-öňki vs 5-öňki baha berýäris.

Upload CAD for an itemized reference

AI Instant Reference Quote + engineering review within 12 business hours.

Other industries

AITeklibiEmail
PDF

Iş e-poçtasy peýdalanylýar (ad@kompaniýa.com). Şahsy poçta hem mümkin. Islegine görä — ýüklemegiň işi hâli-de işleýär.

Bu iş e-poçtasyny diňe şu elementi ibermek we in engineering soraglaryňyza (bahalandyrma, taýýarlama wagty, çyzgylar) jogap bermek üçin ulanar.

Uçuş bölekleri CNC 6061 motor montajlary, çaryş toleranslary, 8–10 gün