STEP / STL / IGES — preview before sign-in.
Zoryra Precision
Dongguan, Hytaýda 5-öçe CNC | Zoryra Precision
Zoryra Precision 5-öçe CNC Dongguan, Hytaý: çylşyrymly ýüzler, köptaraplaýyn bölekler, az taýýarlaýyş. NDA we CMM islege görä. Öňüni alyş uçar üçin möhüm däl. Oýlanylan AS/ISO sanlary ýok.
- Az göçürmeler
- Komplice ýerüstiňler
- Inžener goldawy
- FAI / CMM islege bagly

Three steps to start
Material, qty, finish, lead tier, inspection.
Escalate complex jobs; Dongguan, China produce & ship.
Lead time split
Express reference ≈ 3 days production + 3 days shipping sketch ≈ 6 days total. Standard ≈ 10 days. Quotes always show production and shipping separately.
Long-tail use cases
Common quote paths: robotics EOAT with compound angles, UAV arm connectors, AI cold plates / GPU brackets, electronics housings with undercuts, and non-implant medical interfaces — see industry pages + problem guides, then upload STEP.
When 5-axis helps
Compound angles, deep undercuts reachable in one setup, and organic surfaces that are costly on 3-axis. We still recommend 3-axis when it is cheaper after DFM.
Quality docs & privacy
CAD privacy / NDA options, dimensional reports, FAI, and CMM on request. Factory-direct Dongguan, China. Certification details are shared when available for qualified buyers.
Datum & inspection
Define datum schemes clearly. Fine targets around ±0.002 mm / down to 0.001 mm capability are common with optional CMM / dimensional reports selected in the quote.
Category depth
Pair this page with materials & finishes, industries, milling, and turning hubs — same transparent quote engine everywhere.
Engineering review
5-axis jobs often need DFM alignment — live chat or email within 12 business hours. Large STEP files belong in Upload for quote.
Capability specs & DFM
| Item | Spec |
|---|---|
| Ulanylyş ýagdaýlary | Çylşyrymly ýüzler, köp ýüzli bölekler, az iş meýilnamalary |
| Çydamlyk maksady | CMM barlagy bilen ±0,002 mm anyk maksatlar köplenç |
| Materiallar | Alýumin, poslamaýan polat, enjam polatlary, plastmassa |
| Iň kiçi aýratynlyk | Gurnama diametri we ýetilýän ýer çäklendirilen — STEP-i ir paýlaşyň |
| DFM maslahat | Baş surat meýilnamasyny aç-açan kesgitläň; mugt ýüzlerde artykmaç tolêransiýadan gaça duruň |
Ony kim işleýär we nirede
Parçalar Dongguan Zerui Precision Manufacturing Co., Ltd.den Dongguan, Çin, Guangdongda fabrika tarapyndadyr. Çykyş: ZORYRA / Zoryra Precision.
1 pc. CAD ýüklenenden soň, siz AI-de bir atama alarsyňyz; berk tabşyryklar suratlandyrylmagy we razylaşylýan töleg düýşüni berjaý edýär. Biz üçünji taraply ösümlikleriň suratlaryny öz hatymyz hökmünde bermeýäris.
Bu sahypa hiç hili ISO /AS/FDA sanyny görkezmeýär. Biz saklamaýan sistemeler saklanýan ýaly ýazylmaýar. Fabrika idegleri guramaçylykly geçirilýär.
Zoryra Precision 5-öçe CNC Dongguan, Hytaý: çylşyrymly ýüzler, köptaraplaýyn bölekler, az taýýarlaýyş. NDA we CMM islege görä. Öňüni alyş uçar üçin möhüm däl. Oýlanylan AS/ISO sanlary ýok.
Çylşyrymly ýüzler we köptaraplaýyn bölekler 5-öçe bilen taýýarlaýyşy kesmek üçin ulanylýar. Mugt ýüzleri aşa ölçegden çykarmak däl; datumlary ýazyp, STEP-i ertirden iberiň. Öňüni alyş uçar üçin möhüm däl.
Adaty bölekler
- Közü gelýän ýüzli jaýlar
- Komplice ýerüstiňler
- Az taýýarlaýyşly gurluşlar
- Burçly deşikler
- Impeller bilen golaý ýerler (öňüni alyş uçar üçin möhüm däl)
- Bir bölekli interfeysler
Materiallar & gutarmalar
- 7075 — ýokary güýçli, az çäreler
- 6061 — ällis öýjükler
- 304 — köp ýüzlü aýnaly, pasiwleşdir
- POM — köp ýüzlü in engineering plastik
DFM: datum meýilnamasy, boş ýüzler, çäreler
- Datum meýilnamasyny ýaz; boş ýüzler üçin ýokary çuňlyga gitme
- Enjam ýetmegini barlamak üçin STEP
- Modelde klamp ýüzlerini we saklanylýan ýerleri bellä
- CMM çyzylan görnüşde — standart doly ululykdaky skan däl
Barlag we resminamalar (bellige alnan ýaly)
- Ölçeg hasabatyny belläp
- FAI belgilenipdir
- CMM belgilenipdir
- Material sertifikatlary sargyt şertnamasyna laýyklykda
Eltip bermek wagty (sagat töleg nokadyndan başlaýar)
Eltip bermek derejesi: Iqtisadi / Standart / Çalt. Standart, salgylanmak üçin takmynan 10 iş güni; Çalt, kuwwat bolan wagtynda takmynan 6 gün.
Sagat ylalaşylan töleg nokadyndan başlaýar. Anodizasiýa, tozanan, pasiwizasiýa we daşarky ýylylyk bejergi günleri şol sagatda hasaplanýar.
Titanium, galyň gaty örtük, goşmalar we çylşyrymly ölçeg gurallary gaýtadan başlamagy talap edýär. Tölegen çyzgy hökm edýär.
Biziň etmeýän zatlarymyz
- Standart boýy uçuş üçin kritik ýa-da ITAR däl
- Oýlanyp tapylan AS/ISO ýok
- Implantlar çäginden daşarda
- Hemişe her işlenen bölek 5-oxly işleýär diýme
FAQ
Bu ýerde ISO / AS / FDA sanlaryny sanap görýäňizmi?
Ýasalan sanlar ýok. Saklanmaýan ulgamlary saklanan hökmünde ýazmaýarys. Fabrika saparlaryny guramak bolýar.
1 sany alýarsyňyzmy?
Hawa. CAD-den soň siz AI sanawy bilen maglumat alarsyňyz; berk sargytlar çyzgy we töleg tapgyry boýunça amala aşyrylýar.
Başlangyç sagat haçan işlemäge başlaýar?
Ylalaşylan töleg nokadynda. Anod, toz, pasiwleşdirme günleri sagatda oturýar. Teklipdaky derejeler: Ykdysady / Standart / Express.
5-ox standartmy?
Ýok. Gürrüň etmäge, aýratynlyklaryň az hasaply görnüşleri ýa-da çylşyrymly ýüzleri gerek bolanda bahalandyrýarys.
Uçuş üçin kritik bölekler?
Şuňa çenli standard boýunça däl. Çäkler aýratyn ylalaşyk bolar — we biz AS sanlaryny oýnamayarys.
Is every complex part a 5-axis job?
Not always — some parts are cheaper with smart 3-axis setups. We recommend the economical path after DFM.
What does ~6 days express mean?
A reference split: production + international shipping sketch for the Express tier. Actual dates depend on material, finish, queue, and carrier — shown itemized on your quote.
Do you show ISO certificates on this landing?
Only when a verifiable copy is available for qualified buyers. We emphasize NDA, inspection options, and factory-direct service.
What is 5-axis CNC machining?
The tool or table moves in five degrees of freedom so complex faces can be reached in fewer setups than 3-axis — useful for compound angles and organic surfaces.
What travel / envelope should I expect?
Envelope depends on the assigned machine after DFM. Share overall size early; oversized parts are reviewed before acceptance.
Why does 5-axis often cost more?
Programming, fixtures, and spindle time are higher — but fewer setups can reduce total cost vs multi-setup 3-axis. We recommend the cheaper valid path after DFM.
Which finishes work on 5-axis parts?
Same atlas as milling: as-machined, blast, anodize (Al), passivate (SS), powder, polish. Finish days add to the production clock — see Materials & finishes.
What files work best?
Native STEP preferred so we can evaluate tool access; PDF drawings for GD&T and notes.
Other capabilities
Upload CAD for an itemized reference
AI Instant Quote + engineer backup in business hours. No 3D printing / injection / die casting.
