Typical parts
Liquid / air cold plates & heat spreaders · GPU / accelerator retention brackets · Optical-module & transceiver housings · Server rail / stiffener plates
Zoryra Precision
Mea mālūlū: laupapa, paipa, lagolago. Alumini, pe kopa kafai ata e fai. Faila e alu i HTTPS. E isi NDA. Te itulau tenei mo tuu CNC. Fai te mea, 6061 alumini pe ukamea e see malepe, tuku te tau i te ata, mo te aofaki. Aso fai 8–10, mai te tasi mea.

AI hardware buyers iterate cold plates, stiffeners, and connector panels under thermal + EMI constraints. We quote aluminum / copper paths with finish days on the production clock.
Scope: metal structures and fixtures for AI gear — we do not sell AI models or claim “AI quoting.” Factory visit and QA docs remain optional as elsewhere on the site.
Liquid / air cold plates & heat spreaders · GPU / accelerator retention brackets · Optical-module & transceiver housings · Server rail / stiffener plates
Thermal flatness often 0.05–0.1 mm over contact zones; connector cutouts ±0.05–0.1 mm. Drawing governs — optional CMM / FAI in quote.
Thermal flatness · Masking notes · Pilot → small batch · kilo tonu vaega
Thermal flatness often 0.05–0.1 mm over contact zones; connector cutouts ±0.05–0.1 mm. Drawing governs — optional CMM / FAI in quote.
No — this page is for CNC metal parts used in AI hardware. Upload STEP for a machining quote.
Standard ≈ 8–10 days reference with finish (production + air sketch). Express when blank + light finish allow.
AI Instant Reference Quote + engineering review within 12 business hours.
Te itulau tenei mo tuu CNC. Fai te mea, 6061 alumini pe ukamea e see malepe, tuku te tau i te ata, mo te aofaki. Aso fai 8–10, mai te tasi mea.
Te itulau tenei mo tuu CNC. Fai te mea, 6061 alumini pe ukamea e see malepe, tuku te tau i te ata, mo te aofaki. Aso fai 8–10, mai te tasi mea.