Tipic standard ~10 dis (producziun + skizza en l'aria) · express ~6 dis · dissegn/DFM

Zoryra Precision

parts per indrizs da sfradentar d'IA

Quai èn parts da sfradentar dad AI: plattas da sfradentar, distribuiders e porta. Il material è aluminium, uschenavant ch'il dissegn na pretenda betg arom. La planira è quella dal dissegn. Il temp da furniziun da standard cun surfatscha è circa 8–10 dis.

  • Thermal flatness
  • Masking notes
  • Pilot → small batch
  • Pussaivladads d'inspecziun
parts per indrizs da sfradentar d'IA

AI hardware buyers iterate cold plates, stiffeners, and connector panels under thermal + EMI constraints. We quote aluminum / copper paths with finish days on the production clock.

Scope: metal structures and fixtures for AI gear — we do not sell AI models or claim “AI quoting.” Factory visit and QA docs remain optional as elsewhere on the site.

Why choose Zoryra · parts per indrizs da sfradentar d'IA

Typical parts

Liquid / air cold plates & heat spreaders · GPU / accelerator retention brackets · Optical-module & transceiver housings · Server rail / stiffener plates

Tolerance guidance

Thermal flatness often 0.05–0.1 mm over contact zones; connector cutouts ±0.05–0.1 mm. Drawing governs — optional CMM / FAI in quote.

Watch-outs

Thermal flatness · Masking notes · Pilot → small batch · Pussaivladads d'inspecziun

Typical parts

  • Liquid / air cold plates & heat spreaders
  • GPU / accelerator retention brackets
  • Optical-module & transceiver housings
  • Server rail / stiffener plates

Tolerance guidance

Thermal flatness often 0.05–0.1 mm over contact zones; connector cutouts ±0.05–0.1 mm. Drawing governs — optional CMM / FAI in quote.

Watch-outs

  • Keep anodize / plating off thermal faces unless drawn
  • Call out copper vs aluminum early (lead & cost differ)
  • Share coolant / sealing notes if ports are machined

Related

FAQ

Purschais Vus software dad IA u trenament da models?

Na questa pagina è per tocca da metal CNC che vegn duvrada en hardware dad IA. Chargia si STEP per survegnir ina purschida d'elavuraziun.

Tipic temp da furniziun per plattas da sfradentar?

Standard ≈ 8–10 dis Referenza cun finiziun (producziun + skizza en l'aria). Express sche Rohling + finisch ligera lubeschan quai.

Upload CAD for an itemized reference

AI Instant Reference Quote + engineering review within 12 business hours.

Other industries

CitatdadIAEmail
PDF

Adressa professiunala dad e-mail preferida ([email protected]). Personal mail is OK. Optional il download funcziuna vinavant.

Nus duvrain quest e-mail da fatschenta mo per trametter quest artitgel e per respunder Vossas dumondas tecnicas (offerta, temp da furniziun, dissegns).

parts da sfradentar AI CNC | plattas da sfradentar d'aluminium, planira tenor il dissegn, circa 10 dis