Difaele di feta ka HTTPS. NDA e gona. Letlakala le ke la theko ya CNC. Ngwala selo, bjalo ka aluminiamo 6061 goba tšhipi, ngwala tekanyetšo mo seswantšhong le palo. Nako ya tlwaelo ke matšatši 8–10, go tloga ka se tee, Dongguan, China.

Zoryra Precision

AI tonya karolo karolo

Dikarolo tša go tonya: lepokisi, pompo, lefelo. Aluminiamo, goba koporo ge seswantšho se bolela. Difaele di feta ka HTTPS. NDA e gona. Letlakala le ke la theko ya CNC. Ngwala selo, bjalo ka aluminiamo 6061 goba tšhipi, ngwala tekanyetšo mo seswantšhong le palo. Nako ya tlwaelo ke matšatši 8–10, go tloga ka se tee, Dongguan, China.

  • Thermal flatness
  • Masking notes
  • Pilot → small batch
  • mošomo karolo
AI tonya karolo karolo

AI hardware buyers iterate cold plates, stiffeners, and connector panels under thermal + EMI constraints. We quote aluminum / copper paths with finish days on the production clock.

Scope: metal structures and fixtures for AI gear — we do not sell AI models or claim “AI quoting.” Factory visit and QA docs remain optional as elsewhere on the site.

Why choose Zoryra · AI tonya karolo karolo

Typical parts

Liquid / air cold plates & heat spreaders · GPU / accelerator retention brackets · Optical-module & transceiver housings · Server rail / stiffener plates

Tolerance guidance

Thermal flatness often 0.05–0.1 mm over contact zones; connector cutouts ±0.05–0.1 mm. Drawing governs — optional CMM / FAI in quote.

Watch-outs

Thermal flatness · Masking notes · Pilot → small batch · mošomo karolo

Typical parts

  • Liquid / air cold plates & heat spreaders
  • GPU / accelerator retention brackets
  • Optical-module & transceiver housings
  • Server rail / stiffener plates

Tolerance guidance

Thermal flatness often 0.05–0.1 mm over contact zones; connector cutouts ±0.05–0.1 mm. Drawing governs — optional CMM / FAI in quote.

Watch-outs

  • Keep anodize / plating off thermal faces unless drawn
  • Call out copper vs aluminum early (lead & cost differ)
  • Share coolant / sealing notes if ports are machined

Related

FAQ

Do you provide AI software or model training?

No — this page is for CNC metal parts used in AI hardware. Upload STEP for a machining quote.

Typical lead time for cold plates?

Standard ≈ 8–10 days reference with finish (production + air sketch). Express when blank + light finish allow.

Upload CAD for an itemized reference

AI Instant Reference Quote + engineering review within 12 business hours.

Other industries

AIthekoimeile
PDF

Letlakala le ke la theko ya CNC. Ngwala selo, bjalo ka aluminiamo 6061 goba tšhipi, ngwala tekanyetšo mo seswantšhong le palo. Nako ya tlwaelo ke matšatši 8–10, go tloga ka se tee, Dongguan, China.

Letlakala le ke la theko ya CNC. Ngwala selo, bjalo ka aluminiamo 6061 goba tšhipi, ngwala tekanyetšo mo seswantšhong le palo. Nako ya tlwaelo ke matšatši 8–10, go tloga ka se tee, Dongguan, China.

Dikarolo tša go tonya: lepokisi, pompo, lefelo. Aluminiamo, goba koporo ge seswantšho se bolela. Letlakala le ke la theko ya CNC. Ngwala selo, bjalo ka aluminiamo 6061 goba tšhipi, ngwala tekanyetšo mo seswantšhong le palo. Nako ya tlwaelo ke matšatši 8–10, go tloga ka se tee, Dongguan, China.