STEP / STL / IGES — preview before sign-in.
Zoryra Precision
5-Axis CNC na Dongguan, China | Zoryra Precision
Zoryra Precision 5-axis na Dongguan, China: ihu mgbagwoju anya, akụkụ ọtụtụ-azụ, ntọala pere mpe. NDA na CMM bụ nhọrọ. Ọ bụghị ihe dị mkpa maka ụgbọ elu site na ndabara. Enweghị nọmba AS/ISO e kere eke.
- Ntughari ole na ole
- Ụdị elu ndị dị mgbagwoju anya
- Ndabere injinia
- FAI / CMM nhọrọ

Three steps to start
Material, qty, finish, lead tier, inspection.
Escalate complex jobs; Dongguan, China produce & ship.
Lead time split
Express reference ≈ 3 days production + 3 days shipping sketch ≈ 6 days total. Standard ≈ 10 days. Quotes always show production and shipping separately.
Long-tail use cases
Common quote paths: robotics EOAT with compound angles, UAV arm connectors, AI cold plates / GPU brackets, electronics housings with undercuts, and non-implant medical interfaces — see industry pages + problem guides, then upload STEP.
When 5-axis helps
Compound angles, deep undercuts reachable in one setup, and organic surfaces that are costly on 3-axis. We still recommend 3-axis when it is cheaper after DFM.
Quality docs & privacy
CAD privacy / NDA options, dimensional reports, FAI, and CMM on request. Factory-direct Dongguan, China. Certification details are shared when available for qualified buyers.
Datum & inspection
Define datum schemes clearly. Fine targets around ±0.002 mm / down to 0.001 mm capability are common with optional CMM / dimensional reports selected in the quote.
Category depth
Pair this page with materials & finishes, industries, milling, and turning hubs — same transparent quote engine everywhere.
Engineering review
5-axis jobs often need DFM alignment — live chat or email within 12 business hours. Large STEP files belong in Upload for quote.
Capability specs & DFM
| Item | Spec |
|---|---|
| Ojiji dị iche | Ụdị elu mgbagwoju anya, akụkụ nke ọtụtụ ihu, ntakịrị ịhazi |
| Ebumnuche nnabata | ±0.002 mm ebumnobi dị mfe nkịtị site na nchọpụta CMM |
| Ihe onwunwe | Aluminiọm, igwe anaghị agba nchara, ígwè ngwá ọrụ, plastịk |
| Njirimara kacha nta | Obosara ngwá ọrụ & iru pere mpe — kesaa STEP n’oge mbụ |
| Ntụziaka DFM | Kọwaa usoro datum nke ọma; zere ikwe nkwa nke elu efu |
Onye na-emepụta ya, na ebe
Parts na-factory kpọmkwem site Dongguan Zerui nkenke Manufacturing Co., Ltd. na Dongguan, China, Guangdong. N 'èzí ika: ZORYRA / Zoryra nkenke.
Site 1 pc. Mgbe CAD bulite ị ga-esi ihe AI itemized akwụkwọ; ike iwu na-eso ịbịaru na kwetara ugwo ọnụ. Anyị anaghị agabiga foto osisi nke atọ dịka akara anyị.
Nke a na peeji nke na-egosi dịghị mepụtara ISO / AS / FDA nọmba. A naghị ede sistem anyị na-ejide ka e si ejide ya. Enwere ike ịhazi nleta ụlọ ọrụ mmepụta ihe.
Zoryra Precision 5-axis na Dongguan, China: ihu mgbagwoju anya, akụkụ ọtụtụ-azụ, ntọala pere mpe. NDA na CMM bụ nhọrọ. Ọ bụghị ihe dị mkpa maka ụgbọ elu site na ndabara. Enweghị nọmba AS/ISO e kere eke.
Ihu mgbagwoju anya na akụkụ ọtụtụ-azụ na-eji 5-axis kụọ ntọala. Emeghi oke n'elu nke na-enweghị kpọrọ; dee datums ma zipu STEP n'oge. Ọ bụghị ihe dị mkpa maka ụgbọ elu site na ndabara.
Ihe ndị a na-ahụkarị
- Ụlọ nwere ihu ọtụtụ
- Ụdị elu ndị dị mgbagwoju anya
- Ụkpụrụ nke ntọala pere mpe
- Ụdọ nke ejiri doo anya
- N'akụkụ impeller (ọ bụghị ihe dị mkpa maka ụgbọ elu)
- Njikọ otu akụkụ
Ihe ndị eji eme ya & ntụcha
- 7075 — ike dị elu, ntakịrị ntọala
- 6061 — ụlọ mgbagwoju anya
- 304 — ụzọ igwe anaghị agba nchara ọtụtụ ihu, mee ka ọ dị ọcha
- POM — ụdị plastic injinia ọtụtụ ihu
DFM: usoro datum, elu efu, ntọala
- Dee usoro datum; ejila oke ikike n'elu efu
- STEP iji nyochaa iru ngwaọrụ
- Mara ihu clamp na ebe anaghị etinye ihe na model
- CMM dị ka e tụrụ — ọ bụghị nyocha zuru ezu nke ndabara
Nlele na akwụkwọ (dị ka e gbakwunye tik)
- Akụkọ nha dị ka edeturu
- FAI dị ka e mere akara
- CMM dị ka e mere akara
- Asambodo ihe dabere na nkwekọrịta iwu
Oge ndu (elekere na-amalite na nke ịkwụ ụgwọ)
Ọkwa ndu: Economy / Standard / Express. Standard bụ ihe dị ka ụbọchị iri nke ọrụ dịka ntụaka; Express bụ ihe dị ka 6 mgbe ikike kwekọrọ.
Elekere na-amalite na usoro ịkwụ ụgwọ kwekọrọ. Anodize, ojiji ntụ ntụ, passivate, na ụbọchị ekwesịrị ịrụ ọrụ ọkụ n'èzí nọ n'elu elekere ahụ.
Titanium, mkpuchi siri ike, ntinye, na igwe nke dị mgbagwoju anya na-amalite elekere ọzọ. Ihe osise nke ọnụego na-achịkwa.
Ihe anyị na-emeghị
- Ọ bụghị ihe dị mkpa maka ụgbọ elu ma ọ bụ ITAR site na ndabara
- Enweghị AS/ISO e kere eke
- Ngwa ndị e tinyere n'ime ahụ adịghị n'ogo
- Ọ bụghị akụkụ niile e jiri igwe kpụcha nwere 5-axis
FAQ
Ị na-edekọ nọmba ISO / AS / FDA ebe a?
Enweghị nọmba a chọpụtara. Sistemụ anyị anaghị ejide adịghị ede dịka e jidere. A pụrụ ịhazi izute ụlọ ọrụ.
Ị na-anata otu nkebi?
Ee. Mgbe CAD gasịrị, ị ga-enweta ihe AI depụtara; iwu siri ike soro eserese na nkwụnye ego.
Mgbe ole ka elekere ndu malite?
Na oge akwụ ụgwọ a kwere ekwe. Ụbọchị anodize, powder, na passivate na-anọ na elekere. Ụkwa dị na mkpesa: Economy / Standard / Express.
Ọ bụ 5-axis ndabara?
Mba. Anyị na-enyocha ya mgbe njirimara chọrọ ntakịrị ntọala ma ọ bụ ihu mgbagwoju anya.
Akụkụ dị mkpa maka ụgbọ elu?
Mba site n'ịbụ ndabara. Ọnọdụ ga-abụ nkwekọrịta dị iche — anyị enweghịkwa imepụta nọmba AS.
Is every complex part a 5-axis job?
Not always — some parts are cheaper with smart 3-axis setups. We recommend the economical path after DFM.
What does ~6 days express mean?
A reference split: production + international shipping sketch for the Express tier. Actual dates depend on material, finish, queue, and carrier — shown itemized on your quote.
Do you show ISO certificates on this landing?
Only when a verifiable copy is available for qualified buyers. We emphasize NDA, inspection options, and factory-direct service.
What is 5-axis CNC machining?
The tool or table moves in five degrees of freedom so complex faces can be reached in fewer setups than 3-axis — useful for compound angles and organic surfaces.
What travel / envelope should I expect?
Envelope depends on the assigned machine after DFM. Share overall size early; oversized parts are reviewed before acceptance.
Why does 5-axis often cost more?
Programming, fixtures, and spindle time are higher — but fewer setups can reduce total cost vs multi-setup 3-axis. We recommend the cheaper valid path after DFM.
Which finishes work on 5-axis parts?
Same atlas as milling: as-machined, blast, anodize (Al), passivate (SS), powder, polish. Finish days add to the production clock — see Materials & finishes.
What files work best?
Native STEP preferred so we can evaluate tool access; PDF drawings for GD&T and notes.
Other capabilities
Upload CAD for an itemized reference
AI Instant Quote + engineer backup in business hours. No 3D printing / injection / die casting.
