STEP / STL / IGES — preview before sign-in.
Zoryra Precision
5-Axis CNC wɔ Dongguan, China | Zoryra Pɛpɛɛpɛ
Zoryra Precision 5-axis wɔ Dongguan, China: anim a ɛyɛ den, afã horow a ɛwɔ afã horow pii, nhyehyɛe kakraa bi. NDA ne CMM a wobetumi apaw. Ɛnyɛ wimhyɛn-a ɛho hia denam default so. AS/ISO nɔma biara nni hɔ a wɔayɛ.
- Nsiesiei kakraa bi
- Nneɛma a ɛwɔ soro a ɛyɛ den
- Engineer a ɔyɛ adwuma wɔ hɔ
- FAI / CMM a wopɛ

Three steps to start
Material, qty, finish, lead tier, inspection.
Escalate complex jobs; Dongguan, China produce & ship.
Lead time split
Express reference ≈ 3 days production + 3 days shipping sketch ≈ 6 days total. Standard ≈ 10 days. Quotes always show production and shipping separately.
Long-tail use cases
Common quote paths: robotics EOAT with compound angles, UAV arm connectors, AI cold plates / GPU brackets, electronics housings with undercuts, and non-implant medical interfaces — see industry pages + problem guides, then upload STEP.
When 5-axis helps
Compound angles, deep undercuts reachable in one setup, and organic surfaces that are costly on 3-axis. We still recommend 3-axis when it is cheaper after DFM.
Quality docs & privacy
CAD privacy / NDA options, dimensional reports, FAI, and CMM on request. Factory-direct Dongguan, China. Certification details are shared when available for qualified buyers.
Datum & inspection
Define datum schemes clearly. Fine targets around ±0.002 mm / down to 0.001 mm capability are common with optional CMM / dimensional reports selected in the quote.
Category depth
Pair this page with materials & finishes, industries, milling, and turning hubs — same transparent quote engine everywhere.
Engineering review
5-axis jobs often need DFM alignment — live chat or email within 12 business hours. Large STEP files belong in Upload for quote.
Common materials
Capability specs & DFM
| Item | Spec |
|---|---|
| Fa nsɛm a wɔde di dwuma | Nneɛma a ɛyɛ den, afã horow a ɛwɔ anim pii, nhyehyɛe kakraa bi |
| Abodwokyɛre botae | ±0.002 mm botaeɛ pa a ɛtaa ba wɔ CMM nhwehwɛmu mu |
| Nneɛma a Wɔde Yɛ Adwuma | Aluminium, stainless, adwinnade dade, plastic |
| Min afã bi | Adwinnade diameter & du anohyeto — kyɛ ANAMMƆN ntɛm |
| DFM afotu | Kyerɛkyerɛ datum nhyehyɛe mu pefee; kwati sɛ wobɛma nneɛma a ɛwɔ baabi a ɛnyɛ hwee no atom dodo |
Hena na ɔyɛ no mfiri, ne ɛhe
Afã horow no yɛ adwumayɛbea tẽẽ fi Dongguan Zerui Precision Manufacturing Co., Ltd. wɔ Dongguan, China, Guangdong. Abɔnten so ahyɛnsode: ZORYRA / Zoryra Precision.
Efi 1 pc. CAD upload akyi no wunya AI itemized reference; ahyɛde ahorow a ɛyɛ den di mfonini no ne sikatua node a wɔapene so no akyi. Yɛmfa afifide mfonini ahorow a ɛto so abiɛsa mma sɛ yɛn line.
Kratafa yi nkyerɛ ISO / AS / FDA nɔma biara a wɔayɛ. Wɔankyerɛw nhyehyɛe ahorow a yenni mu sɛnea wokura mu no. Wobetumi ayɛ adwumayɛbea nsrahwɛ ho nhyehyɛe.
Zoryra Precision 5-axis wɔ Dongguan, China: anim a ɛyɛ den, afã horow a ɛwɔ afã horow pii, nhyehyɛe kakraa bi. NDA ne CMM a wobetumi apaw. Ɛnyɛ wimhyɛn-a ɛho hia denam default so. AS/ISO nɔma biara nni hɔ a wɔayɛ.
Anim a ɛyɛ den ne afã horow a ɛwɔ afã horow pii de 5-axis di dwuma de twa nhyehyɛe ahorow. Mfa nneɛma a ɛwɔ soro a wontumi nnya abodwokyɛre ntra so; kyerɛw datums na fa STEP mena ntɛm. Ɛnyɛ wimhyɛn-a ɛho hia denam default so.
Afã horow a wɔtaa yɛ
- Adan a ɛwɔ anim ahorow pii
- Nneɛma a ɛwɔ soro a ɛyɛ den
- Nneɛma a wɔahyehyɛ no kakraa bi
- Ntokuru a wɔayɛ no ahinanan
- Impeller-adjacent (ɛnyɛ wimhyɛn-a ɛho hia) .
- Nkitahodi ahorow a ɛyɛ afã biako
Nneɛma & nneɛma a wɔde wie
- 7075 na ɛwɔ hɔ — ahoɔden a ɛkorɔn, nhyehyɛe kakraa bi
- 6061 na ɛwɔ hɔ — adan a ɛyɛ den
- 304 na ɛwɔ hɔ — anim pii a ɛnyɛ den, pasivate
- POM — multi-face engineering plastic a wɔde yɛ nneɛma
DFM: datum nhyehyɛe, free surfaces, nhyehyɛe ahorow
- Kyerɛw datum nhyehyɛe no; nnyɛ over-tolerance free surfaces
- ANAMMƆN a wode bɛsan ahwɛ adwinnade a wɔde du hɔ no mu
- Hyɛ clamp anim ne keep-outs agyirae wɔ model no so
- CMM sɛnea wɔahyɛ no agyirae — ɛnyɛ default full-size scan
Nhwehwɛmu ne nkrataa (sɛnea wɔahyɛ no agyirae) .
- Dimensional amanneɛbɔ sɛnea wɔahyɛ no agyirae
- FAI sɛnea wɔahyɛ no agyirae
- CMM sɛnea wɔahyɛ no agyirae
- Material certs per order apam biara
Lead time (dɔn no fi ase wɔ payment node no so) .
Akannifoɔ tiers: Sikasɛm / Gyinapɛn / Express. Standard yɛ bɛyɛ adwuma nnafua 10 sɛ nea wɔde gyina so; Kyerɛ bɛyɛ 6 bere a tumi ma kwan no.
Dɔn no fi ase wɔ baabi a wɔapene so sɛ wobetua sika no. Anodize, powder, pasivate, ne outsourced heat-treat nna te saa dɔn no so.
Titanium, atade a ɛyɛ den a ɛyɛ den, nneɛma a wɔde hyɛ mu, ne nneɛma a wɔde susuw nneɛma a ɛyɛ den san yɛ dɔn. Nsɛm a wɔafa aka sketch no na edi so.
Nea yɛnyɛ
- Ɛnyɛ wimhyɛn-a ɛho hia anaasɛ ITAR default
- AS/ISO a wɔayɛ no biara nni hɔ
- Nneɛma a wɔde hyɛ nipadua mu a ɛnyɛ nea wobetumi ayɛ
- Ɛnyɛ ɔfã biara a wɔayam no na ɛkɔ 5-axis
FAQ
So wokyerɛw ISO / AS / FDA nɔma ahorow wɔ ha?
Nnɔmbae biara nni hɔ a wɔayɛ. Wɔankyerɛw nhyehyɛe ahorow a yenni mu sɛnea wokura mu no. Wobetumi ayɛ adwumayɛbea nsrahwɛ ho nhyehyɛe.
So wofa 1 pc?
Aane. CAD akyi no wunya AI itemized reference; firm orders di drawing ne payment node no akyi.
Bere bɛn na dɔn a edi kan no fi ase?
Wɔ sikatua node a wɔapene so no. Anodize, powder, pasivate nna tra dɔn no so. Tiers wɔ quote no so: Sikasɛm / Gyinapɛn / Express.
So 5-axis yɛ nea wɔahyɛ da ayɛ?
Dabi Yɛhwehwɛ mu bere a features hia nhyehyɛe kakraa bi anaasɛ anim a ɛyɛ den no.
Afã horow a ɛho hia ma wimhyɛn?
Ɛnyɛ nea wɔahyɛ da ayɛ. Scope bɛyɛ apam a ɛyɛ soronko — na yɛnyɛ AS nɔma.
Is every complex part a 5-axis job?
Not always — some parts are cheaper with smart 3-axis setups. We recommend the economical path after DFM.
What does ~6 days express mean?
A reference split: production + international shipping sketch for the Express tier. Actual dates depend on material, finish, queue, and carrier — shown itemized on your quote.
Do you show ISO certificates on this landing?
Only when a verifiable copy is available for qualified buyers. We emphasize NDA, inspection options, and factory-direct service.
What is 5-axis CNC machining?
The tool or table moves in five degrees of freedom so complex faces can be reached in fewer setups than 3-axis — useful for compound angles and organic surfaces.
What travel / envelope should I expect?
Envelope depends on the assigned machine after DFM. Share overall size early; oversized parts are reviewed before acceptance.
Why does 5-axis often cost more?
Programming, fixtures, and spindle time are higher — but fewer setups can reduce total cost vs multi-setup 3-axis. We recommend the cheaper valid path after DFM.
Which finishes work on 5-axis parts?
Same atlas as milling: as-machined, blast, anodize (Al), passivate (SS), powder, polish. Finish days add to the production clock — see Materials & finishes.
What files work best?
Native STEP preferred so we can evaluate tool access; PDF drawings for GD&T and notes.
Other capabilities
Upload CAD for an itemized reference
AI Instant Quote + engineer backup in business hours. No 3D printing / injection / die casting.
