Typical parts
Brushless motor mounts (M2/M3 patterns) · Gimbal / camera damping brackets · Arm-to-frame connectors · Battery tray slide rails & latches
Zoryra Precision
Dit is drone dele: motor mounts, arm skakels, gimbal hakies, en battery bakke. Die gewone materiaal is 6061 aluminium, of 7075 wanneer die tekening vra. Verdraagsaamheid en paring gesigte volg die tekening. Standaard loodtyd is ongeveer 8–10 dae vir 1–50 stukke.

UAV buyers iterate fast on motor mounts, gimbal brackets, arm connectors, and battery rails. Share mass targets and mating faces early — we flag thin-wall and anodize risks in DFM before chips fly.
Material path: Al6061-T6 for most structures; 7075 when strength per gram matters (motor mounts, landing gear). Finish: clear / black anodize common; mask threads and arm mating faces unless drawn.
Process: 3-axis pocketing for most brackets; 5-axis when compound arm angles or undercuts reduce setups. Standard tier ≈ 10 days reference (production + air sketch) with anodize on the clock.
See anonymized cases below — arm connector, motor mount, gimbal bracket, battery tray — then upload STEP for an itemized reference quote.
Brushless motor mounts (M2/M3 patterns) · Gimbal / camera damping brackets · Arm-to-frame connectors · Battery tray slide rails & latches
Structural mounting ±0.05 mm typical; bearing / shaft bores per drawing (H7 common); flat damping faces 0.05–0.1 mm when called out. Drawing governs.
Weight targets · Thin-wall notes · Anodize color + masking · 1–50 pc batches
Structural mounting ±0.05 mm typical; bearing / shaft bores per drawing (H7 common); flat damping faces 0.05–0.1 mm when called out. Drawing governs.
Materiaal · kritiese tol. · eerlike CNC-bereik. Maak 'n kaart oop vir 'n geval of laai STEP op om 'n kwotasie te kry. Beelde is deelillustrasies, nie derdeparty-fabrieksskote nie.
6061 vir die meeste quadcopter-monteerplekke; 7075 wanneer sterkte per gram of skroefdraad-uittrekking kritiek is — merk dit op die RFQ vir akkurate lewing en koste.
Ja — merk uitsonderingsvlakke op die PDF; ons maskering draads en armverbindings voor anodisering standaard, tensy die tekening anders sê.
Standaard ≈ 8–10 dae verwysing met helder/swart anodisering (produksie + lugskets). Uitdrukklik wanneer bladsies gereed is en afwerking lig is.
Ja — laai STEP op; ons kwoteer 3-as teen 5-as in DFM wanneer onderkappings of saamgestelde hoeke anders verskeie opstellings sou vereis.
AI Instant Reference Quote + engineering review within 12 business hours.
Werk-e-pos word verkies ([email protected]). Persoonlike e-pos is OK. Opsioneel — die aflaai werk steeds.
Ons sal hierdie werk-e-pos slegs gebruik om hierdie item te stuur en om jou ingenieursvrae te beantwoord (kwotasie, leityd, tekeninge).