STEP / STL / IGES — preview before sign-in.
Zoryra Precision
CNC 5-Axis ci Dongguan, Chine | Zoryra
Zoryra 5-axis ci Dongguan, Chine: kanam yu jafee xam, pàrti yu bari, tabb yu néew. NDA ak CMM mën nañu ko tànn. Du critique ci naaw ci default. Amul benn nimero AS/ISO buñ defar.
- Lu néew ay tabb
- surface yu jaffe
- Sauvegarde ingénieur
- FAI / CMM tànneef

Three steps to start
Material, qty, finish, lead tier, inspection.
Escalate complex jobs; Dongguan, China produce & ship.
Lead time split
Express reference ≈ 3 days production + 3 days shipping sketch ≈ 6 days total. Standard ≈ 10 days. Quotes always show production and shipping separately.
Long-tail use cases
Common quote paths: robotics EOAT with compound angles, UAV arm connectors, AI cold plates / GPU brackets, electronics housings with undercuts, and non-implant medical interfaces — see industry pages + problem guides, then upload STEP.
When 5-axis helps
Compound angles, deep undercuts reachable in one setup, and organic surfaces that are costly on 3-axis. We still recommend 3-axis when it is cheaper after DFM.
Quality docs & privacy
CAD privacy / NDA options, dimensional reports, FAI, and CMM on request. Factory-direct Dongguan, China. Certification details are shared when available for qualified buyers.
Datum & inspection
Define datum schemes clearly. Fine targets around ±0.002 mm / down to 0.001 mm capability are common with optional CMM / dimensional reports selected in the quote.
Category depth
Pair this page with materials & finishes, industries, milling, and turning hubs — same transparent quote engine everywhere.
Engineering review
5-axis jobs often need DFM alignment — live chat or email within 12 business hours. Large STEP files belong in Upload for quote.
Capability specs & DFM
| Item | Spec |
|---|---|
| Jëfandiku | Surface yu jafee xam, pièce yu bari kanam, gëna néew ay configuration |
| Toleransi mébet | ± 0.002 mm mbir yu baax yuñ gëna xam ci saytu CMM |
| jumtukaay | Aluminium, inox, asiye jumtukaay, plastik |
| Min man-man | Diametru jumtukaay bi & yegg ci gàtt - séddoo STEP teel |
| Xeetu DFM | Mandargal bu baax xeetu datum bi; moytu surface yu amul tolerans yu ëpp |
Kan moo koy masin, ak fan
Piyees yi ci usine bi lañuy jëlee ci Dongguan Zerui ci Dongguan, Chine, Guangdong. Màrku bitti: Zoryra / Zoryra njub.
Depuis 1 pc. Ginaaw CAD yebbi nga jot ab royuwaay IA; komànd yu dëgër yi dañu topp nataal bi ak node payoor biñ déggoo. Dunu joxe nataali garabi ñeneen ñu nekk sunu liiñ.
Xët wii amul benn nimero ISO/AS/FDA buñ defar. Sistem yi nu tëye duñu bind ni tëye. Mën nañu la jàppale nga dem seeti usine bi.
Zoryra 5-axis ci Dongguan, Chine: kanam yu jafee xam, pàrti yu bari, tabb yu néew. NDA ak CMM mën nañu ko tànn. Du critique ci naaw ci default. Amul benn nimero AS/ISO buñ defar.
Kanam yu jafee xam ak pàrti yu bari-wet yi dañuy jëfandikoo 5-axis ngir dagg tabb yi. Bul muñ lu ëpp surface bu amul dara; binndal ay datum te nga teela yónnee STEP. Du critique ci naaw ci default.
Piyees yiñ gëna xam
- Dëkkuwaay yu am kanam yu bari
- surface yu jaffe
- jumtukaay yu néew
- pax yu am angle
- Impeller-ci wetu (amul jafe-jafe ci naaw)
- Interfaasu benn piyees
Materiaal ak njeexte
- 7075 — doole bu rëy, gëna néew ay tabb
- 6061 — dëkkuwaay yu jaffe
- 304 — inoxydable multi-face, passif
- POM — plastik ingenieur bu bari kanam
DFM: xeetu datum, surface yu amul dara, tabb
- Bindal xeetu datum bi; bul muñ lu ëpp surface bu amul dara
- JËF ngir xoolaat jumtukaay yegg
- Màrk kanam pince ak keep-outs ci model bi
- CMM niñu ko markee - du scanner bu mat sëkk
Saytu ak këyitu (niñu ko markee)
- Rapport dimensionnel buñu marke
- FAI niko
- CMM niñu ko markee
- Sertifikaa yiñ joxe ci kontraa komànd bu nekk
Lead time (montu bi mingi tàmbali ci node payoor bi)
Niveau de plomb: Koom / Standard / Express. Standard mooy lu tollu ci 10 fani liggéey ngir royuwaay; Wax lu tollu ci 6 sudee kàttan gi may.
Montre bi mingi tàmbali ci node payoor bi ñu déggoo. Bis yi ñuy anodise, poudre, passivate ak outsourcing thermotraitement ñu ngi toog ci waxtu woowu.
Titanium, manteau bu dëgër bu dëll, ay dugal, ak ay jauge yu jafee xam. Sketch quote bi mooy doxal.
Li nu deful
- Du ITAR buy jafe ci naaw
- Amul benn AS/ISO buñ sosal
- implant yi nekkul ci biir
- Du bépp piyees buñ frese dafay daw 5-axis
FAQ
Ndax yaa ngi lim nimero ISO/AS/FDA fii?
Amul ay nimero yuñ sosal. Sistem yi nu tëye duñu bind ni tëye. Mën nañu la jàppale nga dem seeti usine bi.
Ndax yaa ngi jël benn pc?
Waaw. Ginaaw CAD nga am royuwaay bu IA; komànd yu dëgër yi dañu topp nodu rëdd bi ak payoor bi.
Kañ la montor biy tàmbali?
Ci barabu fayukaay bi ñu déggoo. anodise, poudre, passif bis yi toog ci montor bi. Niveau yi ci devis bi: Koom / Standard / Express.
Ndax 5-axis mooy liñ jagleel?
Déedet. Danu koy jàngat sudee man-man yi soxla nañu tabb yu néew wala kanam yu jafee xam.
Piyees yu am solo ci naaw?
Du ci default. Scope dina nekk déggoob bu wuute - te nu sosal nimero AS.
Is every complex part a 5-axis job?
Not always — some parts are cheaper with smart 3-axis setups. We recommend the economical path after DFM.
What does ~6 days express mean?
A reference split: production + international shipping sketch for the Express tier. Actual dates depend on material, finish, queue, and carrier — shown itemized on your quote.
Do you show ISO certificates on this landing?
Only when a verifiable copy is available for qualified buyers. We emphasize NDA, inspection options, and factory-direct service.
What is 5-axis CNC machining?
The tool or table moves in five degrees of freedom so complex faces can be reached in fewer setups than 3-axis — useful for compound angles and organic surfaces.
What travel / envelope should I expect?
Envelope depends on the assigned machine after DFM. Share overall size early; oversized parts are reviewed before acceptance.
Why does 5-axis often cost more?
Programming, fixtures, and spindle time are higher — but fewer setups can reduce total cost vs multi-setup 3-axis. We recommend the cheaper valid path after DFM.
Which finishes work on 5-axis parts?
Same atlas as milling: as-machined, blast, anodize (Al), passivate (SS), powder, polish. Finish days add to the production clock — see Materials & finishes.
What files work best?
Native STEP preferred so we can evaluate tool access; PDF drawings for GD&T and notes.
Other capabilities
Upload CAD for an itemized reference
AI Instant Quote + engineer backup in business hours. No 3D printing / injection / die casting.
