Problem: EV Fixture Calendar Slips After Coating — Split the Clock

Problem: buyer plans a 10-day pilot for jigs / battery brackets, then powder or black oxide adds a silent week and the line trial slips.

Root cause: RFQ says “as soon as possible” without finish; the portal quote looked short because coating was not selected.

Fix: (1) Lock material grade + coating on day one. (2) Read production days and courier days as two lines. (3) Use Express only when blank + light finish allow.

Reference: blast +1–2d, powder +3–5d on the production clock — see Materials & finishes atlas.

Upload the fixture STEP on the quote page, pick the real finish, and share pilot qty + reorder rhythm with engineering.

KuoteAIEmail
PDF

'Oku manakoa 'a e 'imeili ngaue ([email protected]). 'Oku sai pe 'a e meili fakafo'ituitui. Fili — 'oku kei ngaue 'a e download.

Te mau faka’aonga’i ‘a e ‘imeili ngaue ko ‘eni ke ‘ave pe ‘a e me’a ko ‘eni pea ke tali ho’o ngaahi fehu’i faka’enisinia (quote, taimi taki, ngaahi fakatata).

Problem: EV Fixture Calendar Slips After Coating — Split the Clock — Zoryra Precision