STEP / STL / IGES — preview before sign-in.
Zoryra Precision
5-'Akisi CNC 'i Dongguan, Siaina | Zoryra Totonu
Zoryra tonu 5-axis 'i Dongguan, Siaina: ngaahi fofonga faingata'a, ngaahi konga 'o e tafa'aki lahi, si'isi'i ange 'a e setups. NDA mo e CMM 'oku fili. 'Ikai lele-fakatu'utamaki 'i he default. 'Ikai ha ngaahi fika AS/ISO kuo fa'u.
- Si'isi'i ange 'a e ngaahi setup
- Ngaahi funga fihi
- Fakafetongi 'o e 'enisinia
- FAI / CMM fili

Three steps to start
Material, qty, finish, lead tier, inspection.
Escalate complex jobs; Dongguan, China produce & ship.
Lead time split
Express reference ≈ 3 days production + 3 days shipping sketch ≈ 6 days total. Standard ≈ 10 days. Quotes always show production and shipping separately.
Long-tail use cases
Common quote paths: robotics EOAT with compound angles, UAV arm connectors, AI cold plates / GPU brackets, electronics housings with undercuts, and non-implant medical interfaces — see industry pages + problem guides, then upload STEP.
When 5-axis helps
Compound angles, deep undercuts reachable in one setup, and organic surfaces that are costly on 3-axis. We still recommend 3-axis when it is cheaper after DFM.
Quality docs & privacy
CAD privacy / NDA options, dimensional reports, FAI, and CMM on request. Factory-direct Dongguan, China. Certification details are shared when available for qualified buyers.
Datum & inspection
Define datum schemes clearly. Fine targets around ±0.002 mm / down to 0.001 mm capability are common with optional CMM / dimensional reports selected in the quote.
Category depth
Pair this page with materials & finishes, industries, milling, and turning hubs — same transparent quote engine everywhere.
Engineering review
5-axis jobs often need DFM alignment — live chat or email within 12 business hours. Large STEP files belong in Upload for quote.
Capability specs & DFM
| Item | Spec |
|---|---|
| Ngāueʻaki ʻa e ngaahi keisi | Ngaahi funga faingata'a, ngaahi konga 'o e fofonga lahi, si'isi'i ange 'a e ngaahi setups |
| Taumu'a 'o e kataki | ± 0.002 mm ngaahi taumu'a lelei 'oku angamaheni mo e sivi CMM . |
| Ngaahi naunau | 'Aluminiume, stainless, ngaahi ukamea me'angaue, ngaahi pelesitiki |
| Min fotunga | Diameter me'angaue & a'u fakangatangata — vahevahe STEP vave . |
| Fakakaukau DFM | Fakamahino'i mahino 'a e fokotu'utu'u datum; faka'ehi'ehi mei he fu'u kataki'i 'o e ngaahi funga tau'ataina |
Ko hai ‘okú ne mīsini‘i iá, pea ‘i fē .
Ko e ngaahi konga 'oku fale ngaohi'anga-fakahangatonu mei he Dongguan Zerui tonu 'a e ngaohi'anga koloa 'o e Co., Ltd. 'i Dongguan, Siaina, Guangdong. Faka'ilonga ki tu'a: ZORYRA / Zoryra Totonu.
Mei he 1 pc. Hili hono upload 'o e CAD 'oku ke ma'u ha AI itemized 'a e lave; 'oku muimui 'a e ngaahi 'ota fefeka ki he fakatata mo e note totongi kuo alea'i. 'Oku 'ikai ke mau paasi atu 'a e ngaahi 'ata 'o e ngoue 'a e paati hono tolu ko 'emau laine.
'Oku fakahaa'i 'e he peesi ko 'eni 'oku 'ikai ha ngaahi fika ISO / AS / FDA kuo fa'u. Ko e ngaahi sisitemi 'oku 'ikai ke tau pukepuke 'oku 'ikai ke tohi'i ia 'o hange ko e pukepuke. ‘E lava ke fokotu‘utu‘u ‘a e ngaahi ‘a‘ahi ki he fale ngaohí.
Zoryra tonu 5-axis 'i Dongguan, Siaina: ngaahi fofonga faingata'a, ngaahi konga 'o e tafa'aki lahi, si'isi'i ange 'a e setups. NDA mo e CMM 'oku fili. 'Ikai lele-fakatu'utamaki 'i he default. 'Ikai ha ngaahi fika AS/ISO kuo fa'u.
'Oku faka'aonga'i 'e he ngaahi fofonga faingata'a mo e ngaahi konga tafa'aki lahi 'a e 5-axis ke motuhi 'a e setups. 'Oua 'e over-kataki 'a e ngaahi funga tau'ataina; tohi datum pea 'ave vave 'a e STEP. 'Ikai lele-fakatu'utamaki 'i he default.
Ngaahi konga angamaheni .
- Ngaahi fale fofonga lahi
- Ngaahi funga fihi
- Ngaahi fokotu'utu'u si'isi'i ange
- Ngaahi ava tuliki
- Impeller-fehangahangai ('ikai lele-fakatu'utamaki)
- Ngaahi fakafehokotaki'anga 'o e konga 'e taha
Ngaahi naunau & faka'osi
- 7075 — malohi-ma'olunga, si'isi'i ange 'a e ngaahi setups
- 6061 — ngaahi fale faingata'a
- 304 — fofonga lahi 'o e 'ikai ke 'i ai ha 'uli, passivate
- POM — pelesitiki 'enisinia fofonga lahi
DFM: fokotu'utu'u 'o e datum, ngaahi funga tau'ataina, setups
- Tohiʻi ʻa e fokotuʻutuʻu ʻo e datum; 'oua 'e over-kataki 'a e ngaahi funga tau'ataina .
- SITEPU ke vakai'i 'a e me'angaue a'u .
- Faka'ilonga'i 'a e ngaahi fofonga 'o e clamp mo e tauhi-'i he sipinga .
- CMM hange ko ia kuo faka'ilonga'i — 'ikai ko ha default kakato-lahi scan .
Sivi mo e ngaahi tohi (hange ko ia kuo faka'ilonga'i)
- Lipooti faka'ata 'o hange ko ia kuo faka'ilonga'i
- FAI hange ko ia kuo faka'ilonga'i
- CMM hange ko ia kuo faka'ilonga'i
- Ngaahi fakamo'oni 'o e naunau ki he aleapau 'ota
Taimi taki ('oku kamata 'a e uati 'i he note totongi)
Tiers taki: 'Ikonomika / Tu'unga / Fakahaa'i. Ko e tu'unga 'oku feunga mo e 'aho ngaue 'e 10 ko ha fakamo'oni; Fakahaaʻi ʻa e 6 nai ʻi he taimi ʻoku fakaʻatā ai ʻe he malavá.
'Oku kamata 'a e houa 'i he node totongi kuo alea'i. Anodize, efuefu, passivate, mo e ngaahi 'aho 'o e vela-fakalelei'i 'o e outsourced 'oku tangutu 'i he houa ko ia.
Titanium, matolu fefeka-kote, fakahu, mo e ngaahi me'afua faingata'a re-clock. ʻOku puleʻi ʻe he fakatātā ʻo e quote.
Ko e me’a ‘oku ‘ikai ke tau fai .
- 'Ikai puna-fakatu'utamaki pe ITAR 'i he default .
- 'Ikai na'e fa'u 'a e AS/ISO .
- Ngaahi implants 'i tu'a mei he 'atakai
- 'Oku 'ikai ko e konga milled kotoa pe 'oku lele 5-axis .
FAQ
'Oku ke lisi heni 'a e ngaahi fika ISO / AS / FDA?
‘Ikai ha ngaahi fika kuo fa‘u. Ko e ngaahi sisitemi 'oku 'ikai ke tau pukepuke 'oku 'ikai ke tohi'i ia 'o hange ko e pukepuke. ‘E lava ke fokotu‘utu‘u ‘a e ngaahi ‘a‘ahi ki he fale ngaohí.
'Oku ke to'o 'a e 1 pc?
ʻIo. Hili 'a e CAD 'oku ke ma'u ha AI itemized 'a e lave; 'oku muimui 'a e ngaahi 'ota fefeka ki he node 'o e ta mo e totongi.
Ko e fē taimi ʻoku kamata ai ʻa e houa taki?
'I he note totongi kuo alea'i. Anodize, efuefu, passivate 'aho tangutu 'i he houa. Tiers 'i he quote: 'Ikonomika / Tu'unga / Fakahaa'i.
Ko e 5-axis 'a e me'a 'oku 'i ai?
Ikai 'Oku tau sivi'i ia 'i he taimi 'oku fie ma'u ai 'e he ngaahi fotunga 'a e setups si'isi'i ange pe ngaahi fofonga faingata'a.
Ngaahi konga mahuʻinga ki he puná?
ʻIkai ʻi he tuʻunga fakaʻeiʻeikí. Ko e Scope 'e hoko ia ko ha aleapau mavahe — pea 'oku 'ikai ke tau fa'u 'a e ngaahi fika AS.
Is every complex part a 5-axis job?
Not always — some parts are cheaper with smart 3-axis setups. We recommend the economical path after DFM.
What does ~6 days express mean?
A reference split: production + international shipping sketch for the Express tier. Actual dates depend on material, finish, queue, and carrier — shown itemized on your quote.
Do you show ISO certificates on this landing?
Only when a verifiable copy is available for qualified buyers. We emphasize NDA, inspection options, and factory-direct service.
What is 5-axis CNC machining?
The tool or table moves in five degrees of freedom so complex faces can be reached in fewer setups than 3-axis — useful for compound angles and organic surfaces.
What travel / envelope should I expect?
Envelope depends on the assigned machine after DFM. Share overall size early; oversized parts are reviewed before acceptance.
Why does 5-axis often cost more?
Programming, fixtures, and spindle time are higher — but fewer setups can reduce total cost vs multi-setup 3-axis. We recommend the cheaper valid path after DFM.
Which finishes work on 5-axis parts?
Same atlas as milling: as-machined, blast, anodize (Al), passivate (SS), powder, polish. Finish days add to the production clock — see Materials & finishes.
What files work best?
Native STEP preferred so we can evaluate tool access; PDF drawings for GD&T and notes.
Other capabilities
Upload CAD for an itemized reference
AI Instant Quote + engineer backup in business hours. No 3D printing / injection / die casting.
