Zoryra Zoryra Forum Sign in

Materials

Ti-6Al-4V bracket in Dongguan: is the shop time about 8–10 days?

Follow 0 replies · 2 views

Fixture note Lead
Buyers upload a drawing for a Ti-6Al-4V bracket on Zoryra and get an AI instant quote. The Dongguan shop time is about 8–10 days, not including the flight.
Factories join as preferred suppliers and receive matching jobs. This page does not list a certificate number.

Sign in to reply