Typical Standard ~10 days (prod + air sketch) · Express ~6 days · to 0.001 mm

Q&A · Related process guide

Is Zoryra a parts marketplace?

No. The Dongguan shop machines and exports from your print. It does not auction the RFQ to anonymous plants.

Zoryra is not a multi-shop bidding board. Your STEP is reviewed by Dongguan engineering. Machine time in the breakdown is this shop’s path (3-axis / 5-axis as a case), not a public bid. Ask for NDA if the file is sensitive.

Quantity 1 is allowed. Preview with no login; sign in to save or order. Target 12h UTC+8.

Lead time splits production and freight. No implants. No invented ISO. Upload a STEP to get an instant quote.

Related process guide

Get Instant Quote

Upload STEP (preferred, ≤80 MB). Preview a quote with no account; sign in to save or order.

Get Instant Quote