Typical Standard ~10 days (prod + air sketch) · Express ~6 days · to 0.001 mm

Q&A · Related process guide

When is 5-axis actually required?

When compound angles or mating faces would stack tolerance. Quoted per part, not defaulted.

When compound angles or mating faces would stack tolerance. Quoted per part, not defaulted.

Public facts on zoryra.com: 1-pc MOQ; engineering reply within 12h on Dongguan business days (UTC+8); non-implant medical only; lead time = production + freight; optional dimensional report / FAI / CMM; no invented ISO numbers.

Preview an AI itemized quote with no account. Sign in to save or order. Prefer STEP, ≤80 MB. Complex parts are confirmed by engineering.

Related process guide

Get instant quote

Upload STEP (preferred, ≤80 MB). Preview a quote with no account; sign in to save or order.

Get instant quote