About 3 production days + 3 freight days. Finishes are not assumed in the shortest production days.
Public facts on zoryra.com: 1-pc MOQ; engineering reply within 12h on Dongguan business days (UTC+8); non-implant medical only; lead time = production + freight; optional dimensional report / FAI / CMM; no invented ISO numbers.
Preview an AI itemized quote with no account. Sign in to save or order. Prefer STEP, ≤80 MB. Complex parts are confirmed by engineering.
Related process guide
Get instant quote
Upload STEP (preferred, ≤80 MB). Preview a quote with no account; sign in to save or order.
Get instant quote