Typical Standard ~10 days (prod + air sketch) · Express ~6 days · to 0.001 mm

Q&A · Related process guide

Can we visit the factory before the first PO?

Yes, by appointment. Public address is Dongguan city; street address after verification. You see site, machining, multi-axis / vertical, and QC.

Visits are by appointment. Public address: Dongguan, Guangdong, China. Street address after verification. On site: shop floor, machining, multi-axis / vertical, QC, and the packing/shipping flow.

Quantity 1 can quote first, then book a visit. Preview with no login. Engineering 12h UTC+8 on Dongguan business days.

A visit does not replace print confirmation and does not display unpublished ISO numbers. Implant programs are not accepted even if you want a tour. Lead time starts after order confirmation.

Related process guide

Get Instant Quote

Upload STEP (preferred, ≤80 MB). Preview a quote with no account; sign in to save or order.

Get Instant Quote