Site indication: typical standard about 10 days (production + air); express about 6 days; economy longer. Anodize about +2–4 days and blast about +1–2 days stack on production — they are not free freight.
Quantity 1 can pick a tier. Preview with no login. Complex parts: 12h UTC+8 to confirm whether express production fits. Prefer STEP.
US / EU / JP / KR change capacity, not a USA-only rule. No implants. Get an instant quote.
Related process guide
Get Instant Quote
Upload STEP (preferred, ≤80 MB). Preview a quote with no account; sign in to save or order.
Get Instant Quote