Prefer STEP / STP. SolidWorks, Parasolid, IGES, STL, DXF / DWG, and PDF are accepted; ZIP is fine. Note software version and configuration so the feature tree does not surprise anyone.
Preview with no login. Quantity 1 is enough. Target 12h UTC+8. State mm or inch.
Lead time splits production and freight. No implants. Tolerances still come from the print.
Related process guide
Get Instant Quote
Upload STEP (preferred, ≤80 MB). Preview a quote with no account; sign in to save or order.
Get Instant Quote