South Korea can be quoted. Put destination and lead-time tier in the notes. The engineering clock is Dongguan weekdays UTC+8, target 12h — not a Seoul business day.
Quantity 1 can prototype. Prefer STEP, ≤80 MB. Preview with no login. Name 6061 / 7075 / 304 / 316; do not write only “aluminum” or “stainless.”
Inspection docs optional. No implants. No invented ISO. Get an instant quote.
Related process guide
Get Instant Quote
Upload STEP (preferred, ≤80 MB). Preview a quote with no account; sign in to save or order.
Get Instant Quote