Typical Standard ~10 days (prod + air sketch) · Express ~6 days · to 0.001 mm

Q&A · Related process guide

On small batches, is inspection sampled or 100%?

Per the order. Full dimensional or 100% CMM only if you tick it — not a silent default.

Tens to hundreds of pieces: inspection scope is written on the order. Unticked is not “CMM every piece.” Say sample vs 100% on key dimensions; CMM hours are assessed per part.

A 1-pc prototype still follows what you tick. Align the plan in 12h UTC+8 if needed.

Inspection adders show on the quote. Duties extra. No implants. No invented cert numbers.

Related process guide

Get Instant Quote

Upload STEP (preferred, ≤80 MB). Preview a quote with no account; sign in to save or order.

Get Instant Quote