Typical Standard ~10 days (prod + air sketch) · Express ~6 days · to 0.001 mm

Q&A · Related process guide

Powder coat vs anodize — how many extra days?

Powder about +3–5 days; anodize about +2–4 days. Both sit on production. Economy / standard / express sketches do not silently include every finish.

Powder about +3–5 days, anodize about +2–4 days (hardcoat longer), blast about +1–2, passivate about +1–3. Express ~6 / standard ~10 / economy ~17 are production + air sketches — not “any finish still ships in 6 days.”

Quantity 1 can quote. Preview with no login. Engineering confirms the real stack within 12h UTC+8.

Stainless takes passivate, not anodize. No implants. Inspection optional. No invented ISO numbers.

Related process guide

Get Instant Quote

Upload STEP (preferred, ≤80 MB). Preview a quote with no account; sign in to save or order.

Get Instant Quote