Typical Standard ~10 days (prod + air sketch) · Express ~6 days · to 0.001 mm

Q&A · Related process guide

After the AI quote, how do we PO — and when does production start?

Preview needs no account. Production starts after process lock and the payment node on the confirmation, not at CAD upload.

You can preview an itemized AI Instant Quote with no login. Sign in to save or place the order. Send a PO against the engineer-confirmed quote: revision, material, finish, qty, Incoterm, and ship-to.

The lead-time clock starts after process lock and the payment node written on that confirmation — not when the STEP hits the server. Weekend uploads do not run the 12-hour engineering clock until Dongguan business hours (UTC+8).

NDA can be signed before CAD if the files are sensitive. 泽锐精工 / ZORYRA is factory-direct in Dongguan, not a parts marketplace.

Related process guide

Get Instant Quote

Upload STEP (preferred, ≤80 MB). Preview a quote with no account; sign in to save or order.

Get Instant Quote