Material CoC, dimensional report, FAI, and CMM are separate options. Tick what you need. Whether a heat number traces to that lot follows the agreed scope — we do not print unverified certificate numbers in marketing.
Quantity 1 can tick docs. Preview with no login. Engineering confirms within 12h UTC+8 whether the file list changes the lead tier.
Lead time remains production + freight. No implants. A material CoC is not a device registration.
Related process guide
Get Instant Quote
Upload STEP (preferred, ≤80 MB). Preview a quote with no account; sign in to save or order.
Get Instant Quote