Typical Standard ~10 days (prod + air sketch) · Express ~6 days · to 0.001 mm

Q&A · Related process guide

When is Dongguan 5-axis small-batch the right call?

Fewer setups and spatial angles make 5-axis a case. If 3-axis finishes the part, do not default 5-axis time. Quantity 1 can ask.

5-axis is not a synonym for “more precise.” Angled holes, multi-face fits, and a shorter setup stack are what we review. The AI sketch itemizes the model; it does not label every aluminum block as 5-axis.

Quantity 1 through small batch can quote. Target 12h UTC+8. Typical mill envelope about 600 × 400 × 250 mm; larger sizes go through engineering first. Prefer STEP.

Lead time is still production + freight. Inspection optional. No implants. No invented ISO. Upload a STEP to get an instant quote.

Related process guide

Get Instant Quote

Upload STEP (preferred, ≤80 MB). Preview a quote with no account; sign in to save or order.

Get Instant Quote