Typical Standard ~10 days (prod + air sketch) · Express ~6 days · to 0.001 mm

Q&A · Related process guide

Can we switch a live order to Express after production has started?

Express is chosen at confirmation. After material issue or first ops, we can discuss a re-slot — not a public rush tariff, and not a promise the old date still holds.

The site sketch of Express ~6 days is about 3 production days + 3 freight days, chosen when the order is confirmed. Finishes (anodize about +2–4 days, blast about +1–2) are not inside the shortest production days. That sketch is not a door-to-door calendar.

After material is issued or first ops have started, 泽锐精工 / ZORYRA can review overtime or a queue re-slot. We do not publish a rush surcharge table, and the original confirmation date does not keep counting by itself. CMM, anodize capacity, and destination freight can still block a 6-day sketch.

Weekend messages do not run the 12-hour engineering clock until Dongguan business hours (UTC+8). Quantity 1 can still be discussed. No implants. If Express no longer fits, we write a new confirmation instead of pretending the old one holds.

Related process guide

Get Instant Quote

Upload STEP (preferred, ≤80 MB). Preview a quote with no account; sign in to save or order.

Get Instant Quote