Typical Standard ~10 days (prod + air sketch) · Express ~6 days · to 0.001 mm

Q&A · Related process guide

What if the drawing has no datums?

We fixture as a conventional job and use untitled tolerances. Add datums for critical fits or engineering will ask before the price is locked.

A STEP without datums can still get an AI sketch quote. That sketch is not a locked inspection plan. For position or profile control, add datums or name the locating faces.

Preview the quote with no account. Sign in to save or order. Complex parts: 12h target on Dongguan business days (UTC+8). Quantity 1 can come back with datums added.

QA docs are optional. Lead time splits production and freight. No implants. A missing datum is not replaced by an unpublished certificate number.

Related process guide

Get Instant Quote

Upload STEP (preferred, ≤80 MB). Preview a quote with no account; sign in to save or order.

Get Instant Quote