Typical Standard ~10 days (prod + air sketch) · Express ~6 days · to 0.001 mm

Q&A · Related process guide

If you already ran CMM, do we still incoming-inspect?

CMM is optional outgoing inspection. Incoming inspection is yours. Our report is not automatically the destination receiving rule.

Tick CMM or a dimensional report and we inspect outgoing as agreed (sample or 100%). Your incoming lab or a third party is your process — it is not baked into the AI sketch.

Quantity 1 can tick CMM. Preview with no login. Complex parts: 12h UTC+8. Say sample vs 100%.

Inspection time sits on production days. Duty is separate. No implants. No invented ISO number as a receiving criterion.

Related process guide

Get Instant Quote

Upload STEP (preferred, ≤80 MB). Preview a quote with no account; sign in to save or order.

Get Instant Quote