As-machined, blast, and anodize are quote-page options. Blast about +1–2 days; anodize about +2–4 days. If only some faces blast, call them — a whole-part assumption changes time and days.
Quantity 1 can preview with no login. Complex parts: 12h UTC+8. Aluminum 6061 / 7075 commonly uses this finish set.
Lead time = production (including finish) + freight. Do not anodize stainless. No implants.
Related process guide
Get Instant Quote
Upload STEP (preferred, ≤80 MB). Preview a quote with no account; sign in to save or order.
Get Instant Quote