Typical Standard ~10 days (prod + air sketch) · Express ~6 days · to 0.001 mm

Q&A · Related process guide

Air freight to US / EU / UK / JP / KR / AU — how is lead time split?

Dongguan production first, then international freight. Those countries are destinations. The formula stays production + freight, and it is not USA-only.

Lead time has two parts: shop days (including finish and optional inspection) plus international freight. Air to the US, EU, UK, Japan, Korea, or Australia changes capacity, not the formula. Economy / standard / express are freight tiers, not a factory move.

Quantity 1 samples often use the air sketch. Preview with no login. Complex parts: 12h UTC+8 to confirm express production.

Duty is separate. No implants. Inspection docs optional. Upload a STEP to get an instant quote.

Related process guide

Get Instant Quote

Upload STEP (preferred, ≤80 MB). Preview a quote with no account; sign in to save or order.

Get Instant Quote