p61 black anodize in Dongguan: what goes on the drawing? · Zoryra Precision"/>

Typical Standard ~10 days (prod + air sketch) · Express ~6 days · to 0.001 mm

Q&A · Aluminum 6061 / 7075 guide

6061 black anodize in Dongguan: what goes on the drawing?

Write 6061-T6, black anodize, and which holes to mask. Zoryra quotes that from the Dongguan shop. The standard shop lead time is about 8–10 days, not including the flight.

Buyers upload a drawing for 6061 black anodize on Zoryra and get an AI instant quote. The Dongguan shop time is about 8–10 days, not including the flight. Write 6061-T6, black anodize, and which holes to mask.

Factories join as preferred suppliers and receive matching jobs. This page does not list a certificate number.

Related process guide

Upload a drawing to see a reference price

Upload a drawing to see a reference price