Typical Standard ~10 days (prod + air sketch) · Express ~6 days · to 0.001 mm

Q&A · Aluminum 6061 / 7075 guide

Is a 304 shaft CNC-turned in Dongguan?

A round 304 shaft is CNC-turned in Dongguan, not milled from plate. The standard shop lead time is about 8–10 days, not including the flight.

Buyers upload a drawing for a 304 shaft, CNC-turned, not milled from plate on Zoryra and get an AI instant quote. The Dongguan shop time is about 8–10 days, not including the flight.

Factories join as preferred suppliers and receive matching jobs. This page does not list a certificate number.

Related process guide

Upload a drawing to see a reference price

Upload a drawing to see a reference price