Case: 5-Axis Al7075 Housing — ±0.01 mm, Express ~6 Days

Part type: compact equipment housing with compound undercuts that would need multiple 3-axis setups.

Material: Al7075-T6. Finish: bead blast + black anodize on exterior; as-machined sealing faces.

Tolerances: primary datums ±0.01 mm; sealing flatness 0.05 mm; general ±0.1 mm. Capability down to 0.001 mm only where drawn.

Process: 5-axis rough + finish in two setups. DFM saved one fixture vs 3-axis path — quoted both options, buyer chose 5-axis for schedule risk.

Lead time: Express reference ≈ 3 days production + 3 days air sketch ≈ 6 days. Hard anodize would add finish days — not used here.

Upload complex STEP to the 5-axis landing for instant quote; ask engineering if 3-axis is cheaper after DFM.

AIkakumafɔlenEmail
PDF

Baara email de ka fisa ([email protected]). Mɔgɔ yɛrɛ ka batakiw bɛ OK. A bɛ se ka kɛ — telesarse bɛ baara kɛ hali bi.

An bɛna baara kɛ ni nin baara imɛri ye dɔrɔn walasa ka nin fɛn in ci ani k’i ka ɛntɛrinɛti ɲininkaliw jaabi (quote, lead time, drawings).

Case: 5-Axis Al7075 Housing — ±0.01 mm, Express ~6 Days — Zoryra Precision