STEP / STL / IGES — preview before sign-in.
Zoryra Precision
5-Axis CNC min bɛ Dongguan, Sinuwa jamana na | Zoryra Precision ye
Zoryra Precision 5-axis dongguan, Sinuwa jamana na: ɲɛda gɛlɛnw, fan caman yɔrɔw, sigicogo caman. NDA ni CMM ye ŋaniyataama ye. A tɛ flight-critical ye ka da a kan. AS/ISO nimɔrɔ minnu dabɔra, olu si ma sɔrɔ.
- Setupw ka dɔgɔn
- Surface complexes (yɔrɔ gɛlɛnw).
- Ɛntɛrinɛti ka kɔpi
- FAI / CMM ye fɛn ye min bɛ se ka kɛ

Three steps to start
Material, qty, finish, lead tier, inspection.
Escalate complex jobs; Dongguan, China produce & ship.
Lead time split
Express reference ≈ 3 days production + 3 days shipping sketch ≈ 6 days total. Standard ≈ 10 days. Quotes always show production and shipping separately.
Long-tail use cases
Common quote paths: robotics EOAT with compound angles, UAV arm connectors, AI cold plates / GPU brackets, electronics housings with undercuts, and non-implant medical interfaces — see industry pages + problem guides, then upload STEP.
When 5-axis helps
Compound angles, deep undercuts reachable in one setup, and organic surfaces that are costly on 3-axis. We still recommend 3-axis when it is cheaper after DFM.
Quality docs & privacy
CAD privacy / NDA options, dimensional reports, FAI, and CMM on request. Factory-direct Dongguan, China. Certification details are shared when available for qualified buyers.
Datum & inspection
Define datum schemes clearly. Fine targets around ±0.002 mm / down to 0.001 mm capability are common with optional CMM / dimensional reports selected in the quote.
Category depth
Pair this page with materials & finishes, industries, milling, and turning hubs — same transparent quote engine everywhere.
Engineering review
5-axis jobs often need DFM alignment — live chat or email within 12 business hours. Large STEP files belong in Upload for quote.
Common materials
Capability specs & DFM
| Item | Spec |
|---|---|
| Baara kɛ ni ko kɛlenw ye | Yɔrɔ gɛlɛnw, ɲɛda caman yɔrɔw, sigicogo damadɔ |
| Muɲuli laɲini | ±0,002 mm laɲini ɲuman minnu bɛ sɔrɔ CMM sɛgɛsɛgɛli la |
| Fɛn minnu bɛ kɛ ka baara kɛ | Aluminiyɔmu, inox, baarakɛminɛnw, plastikiw |
| Min ka baarakɛcogo | Baarakɛminɛnw cɛmancɛ & se danma — tila STEP joona |
| DFM ka laadilikan | Datumu sɛgɛsɛgɛli ɲɛfɔ ka jɛya; aw kana yɔrɔ hɔrɔnmaw muɲu kojugu |
Jɔn b’a kɛ masin na, ani yɔrɔ min
Yɔrɔw bɛ izini siratigɛ la ka bɔ Dongguan Zerui Precision Manufacturing Co., Ltd. la Dongguan, Sinuwa, Guangdong. Kɛnɛma marka: ZORYRA / Zoryra Precision.
Ka bɔ 1 pc. CAD upload kɔfɛ i bɛ AI itemized reference sɔrɔ; yamaruya jɔnjɔnw bɛ tugu ja ni bɛnkan sarali node kɔ. An tɛ tɛmɛn mɔgɔ sabananw ka jiriw fotow kan k’u kɛ an ka layini ye.
Nin ɲɛ in tɛ ISO / AS / FDA nimɔrɔ dabɔlenw jira. An tɛ sistɛmu minnu minɛ, olu ma sɛbɛn i n’a fɔ u bɛ minɛ cogo min na. Izini lajɛw bɛ se ka labɛn.
Zoryra Precision 5-axis dongguan, Sinuwa jamana na: ɲɛda gɛlɛnw, fan caman yɔrɔw, sigicogo caman. NDA ni CMM ye ŋaniyataama ye. A tɛ flight-critical ye ka da a kan. AS/ISO nimɔrɔ minnu dabɔra, olu si ma sɔrɔ.
Ɲɛda gɛlɛnw ni fan caman yɔrɔw bɛ baara kɛ ni 5-axis ye walasa ka setupw tigɛ. Aw kana yɔrɔ minnu muɲu kojugu; dataw sɛbɛn ka STEP ci joona. A tɛ flight-critical ye ka da a kan.
Yɔrɔ minnu bɛ kɛ cogoya la
- Sow ɲɛda caman bɛ yen
- Surface complexes (yɔrɔ gɛlɛnw).
- Setup-structures (daɲɛw sigicogo) minnu ka dɔgɔ
- Dingɛ minnu bɛ kɛ kɛrɛfɛ
- Impeller-adjacent (a tɛ flight-critique ye) .
- Fɛn kelen-kelen-ko-ɲɛnabɔli-minɛnw
Fɛn minnu bɛ kɛ & finiw
- 7075 ye — fanga ka bon, sigicogo minnu ka dɔgɔ
- 6061 ye — sow gɛlɛnw
- 304. Ɲɛjirali dɔw — ɲɛda caman tɛ sɔgɔ, passive
- POM ye — ɲɛda caman injiniyɛri plastiki
DFM : datum scheme, surfaces libres, sigicogo
- Datumu sɛgɛsɛgɛli sɛbɛn; aw kana muɲuli kɛ ka tɛmɛ yɔrɔw kan minnu tɛ muɲuli kɛ
- SEN ye ka baarakɛminɛnw secogo lajɛ
- Marka kɛ clamp ɲɛda ni keep-outs kan modeli kan
- CMM iko ticked — a tɛ default full-size scan ye
Sɛgɛsɛgɛli ni sɛbɛnw (i n’a fɔ u bɛ taamasiyɛn kɛ cogo min na) .
- Rapport dimensionnel i n’a fɔ a bɛ taamasiyɛn kɛ cogo min na
- FAI i n’a fɔ a bɛ taamasiyɛn kɛ cogo min na
- CMM i n’a fɔ a bɛ taamasiyɛn kɛ cogo min na
- Materiel certs ka kɛɲɛ ni komandi bɛnkan ye
Lead time (waati bɛ daminɛ sarali yɔrɔ la) .
Kunnafoni ɲɛmɔgɔyaso : Sɔrɔko / Standard / Express. Standard ye baarakɛdon 10 ɲɔgɔn ye i n’a fɔ kunnafoni; Aw bɛ 6 ɲɔgɔn fɔ ni seko bɛ se ka kɛ.
Waati bɛ daminɛ wari sarayɔrɔ la min bɛnna bɛnkansɛbɛn kɔnɔ. Anodize, powder, passivate ani outsourced heat-treat donw sigilen bɛ o waati kan.
Titanium, fini gɛlɛn gɛlɛn, fɛn minnu bɛ don a kɔnɔ, ani jateminɛkɛlan gɛlɛnw bɛ segin ka waati kɛ. Quote sketch bɛ a ɲɛminɛ.
An t’a kɛ min ye
- A tɛ flight-critical ye walima ITAR ye ka da a kan
- AS/ISO dabɔlen tɛ
- Fɛn minnu bɛ don a kɔnɔ, olu tɛ se ka kɛ
- Yɔrɔ min bɛ sɔgɔ, o bɛɛ tɛ boli 5-axis (5-axis) la
FAQ
Yala aw bɛ ISO / AS / FDA nimɔrɔw fɔ yan wa?
Jateden minnu dabɔra, olu si tɛ yen. An tɛ sistɛmu minnu minɛ, olu ma sɛbɛn i n’a fɔ u bɛ minɛ cogo min na. Izini lajɛw bɛ se ka labɛn.
Yala aw bɛ 1 pc ta wa?
Awɔ. CAD kɔfɛ i bɛ AI itemized reference sɔrɔ; yamaruya jɔnjɔnw bɛ tugu ja ni sarali node kɔ.
Plomb wagati bɛ daminɛ tuma jumɛn?
Bɛnkansɛbɛn sarali yɔrɔ la. Anodize, mugu, passivate donw sigilen bɛ waati kan. Tiers kan quote: Sɔrɔko / Standard / Express.
Yala 5-axis ye default ye wa?
Ayi, an b’a jateminɛ ni fɛnw mago bɛ sigicogo caman na walima ɲɛda gɛlɛnw na.
Yɔrɔ minnu nafa ka bon kosɛbɛ awiyɔn boli la?
A tɛ kɛ ka kɛɲɛ ni default ye. Scope tun bɛna kɛ bɛnkan danfaralen ye — wa an tɛ AS nimɔrɔw dabɔ.
Is every complex part a 5-axis job?
Not always — some parts are cheaper with smart 3-axis setups. We recommend the economical path after DFM.
What does ~6 days express mean?
A reference split: production + international shipping sketch for the Express tier. Actual dates depend on material, finish, queue, and carrier — shown itemized on your quote.
Do you show ISO certificates on this landing?
Only when a verifiable copy is available for qualified buyers. We emphasize NDA, inspection options, and factory-direct service.
What is 5-axis CNC machining?
The tool or table moves in five degrees of freedom so complex faces can be reached in fewer setups than 3-axis — useful for compound angles and organic surfaces.
What travel / envelope should I expect?
Envelope depends on the assigned machine after DFM. Share overall size early; oversized parts are reviewed before acceptance.
Why does 5-axis often cost more?
Programming, fixtures, and spindle time are higher — but fewer setups can reduce total cost vs multi-setup 3-axis. We recommend the cheaper valid path after DFM.
Which finishes work on 5-axis parts?
Same atlas as milling: as-machined, blast, anodize (Al), passivate (SS), powder, polish. Finish days add to the production clock — see Materials & finishes.
What files work best?
Native STEP preferred so we can evaluate tool access; PDF drawings for GD&T and notes.
Other capabilities
Upload CAD for an itemized reference
AI Instant Quote + engineer backup in business hours. No 3D printing / injection / die casting.
