Problem: EV Fixture Calendar Slips After Coating — Split the Clock

Problem: buyer plans a 10-day pilot for jigs / battery brackets, then powder or black oxide adds a silent week and the line trial slips.

Root cause: RFQ says “as soon as possible” without finish; the portal quote looked short because coating was not selected.

Fix: (1) Lock material grade + coating on day one. (2) Read production days and courier days as two lines. (3) Use Express only when blank + light finish allow.

Reference: blast +1–2d, powder +3–5d on the production clock — see Materials & finishes atlas.

Upload the fixture STEP on the quote page, pick the real finish, and share pilot qty + reorder rhythm with engineering.

AINsɛmaWɔafaKaEmail
PDF

Adwuma email a wɔpɛ ([email protected]). Ankorankoro nkrataa a wɔde mena no yɛ OK. Optional — download no da so ara yɛ adwuma.

Yɛde adwuma email yi bedi dwuma de amena saa ade yi nkutoo na yɛabua wo engineering nsɛmmisa (quote, lead time, drawings).

Problem: EV Fixture Calendar Slips After Coating — Split the Clock — Zoryra Precision