Aṣoju Standard ~ 10 ọjọ (prod + air Sketch) · Express ~ 6 ọjọ · iyaworan / DFM

Zoryra Precision

5-ipo CNC ni Dongguan, China | Konge Zoryra

Zoryra konge 5-ipo ni Dongguan, China: eka roboto, olona-apa awọn ẹya, diẹ setups beere. NDA ati CMM aṣayan. Ko flight-lominu ni nipa aiyipada. Ko si fabricated AS / ISO awọn nọmba.

  • Diẹ setups
  • Awọn aaye ti o nira
  • Afẹyinti ẹlẹrọ
  • FAI / CMM aṣayan

Three steps to start

1Upload CAD

STEP / STL / IGES — preview before sign-in.

2Configure

Material, qty, finish, lead tier, inspection.

3Confirm

Escalate complex jobs; Dongguan, China produce & ship.

Lead time split

Express reference ≈ 3 days production + 3 days shipping sketch ≈ 6 days total. Standard ≈ 10 days. Quotes always show production and shipping separately.

Long-tail use cases

Common quote paths: robotics EOAT with compound angles, UAV arm connectors, AI cold plates / GPU brackets, electronics housings with undercuts, and non-implant medical interfaces — see industry pages + problem guides, then upload STEP.

When 5-axis helps

Compound angles, deep undercuts reachable in one setup, and organic surfaces that are costly on 3-axis. We still recommend 3-axis when it is cheaper after DFM.

Quality docs & privacy

CAD privacy / NDA options, dimensional reports, FAI, and CMM on request. Factory-direct Dongguan, China. Certification details are shared when available for qualified buyers.

Datum & inspection

Define datum schemes clearly. Fine targets around ±0.002 mm / down to 0.001 mm capability are common with optional CMM / dimensional reports selected in the quote.

Category depth

Pair this page with materials & finishes, industries, milling, and turning hubs — same transparent quote engine everywhere.

Engineering review

5-axis jobs often need DFM alignment — live chat or email within 12 business hours. Large STEP files belong in Upload for quote.

Common materials

7075TitaniumIrin alagbara,Àwọn páláìsì ẹ̀rọ-ayárabíàsá
Open materials atlas →

Capability specs & DFM

ItemSpec
Lo awọn ọranComplex roboto, olona-oju awọn ẹya, kere setups
Ibi-afẹde ifarada± 0.002 mm itanran afojusun wọpọ pẹlu CMM ayẹwo
Awọn ohun eloAluminiomu, alagbara, irinṣẹ irin, pilasitik
Min ẹya ara ẹrọỌpa opin & arọwọto lopin — pin STEP ni kutukutu
DFM sampleṢalaye eto datum ni kedere; yago fun apọju-tolerancing free roboto

Tani o ṣe atunṣe, ati nibo ni o

Awọn ẹya ara jẹ ile-iṣẹ taara lati Dongguan Zerui Precision Manufacturing Co., Ltd. ni Dongguan, China, Guangdong. Àmì òde: ZORYRA / Zoryra Precision.

Láti 1 pc. Lẹ́yìn gbígbé CAD o gba ìtumọ̀ AI itemized; àwọn àṣẹ tí ó dúró ṣinṣin ń tẹ̀lé àwòrán àti nọ́ńbà ìsanwó tí wọ́n bá gbà. A kì í kọjá àwọn àwòrán àwọn ewéko ẹni-kẹta gẹ́gẹ́ bí ìlà wa.

Ojú-ìwé yìí kò ṣàfihàn àwọn nọ́mbà ISO / AS / FDA tí a ṣàwárí. Àwọn ètò tí a kò mú ni a kò kọ gẹ́gẹ́ bí ó ti wà. A lè ṣètò àbẹ̀wò ilé-iṣẹ́.

Zoryra konge 5-ipo ni Dongguan, China: eka roboto, olona-apa awọn ẹya, diẹ setups beere. NDA ati CMM aṣayan. Ko flight-lominu ni nipa aiyipada. Ko si fabricated AS / ISO awọn nọmba.

Eka roboto ati olona-apa awọn ẹya ara lo 5-ipo machining lati din setups. Maa ko waye overly ju tolerances to free roboto; setumo datums ki o si fi STEP awọn faili ni kutukutu. Ko flight-lominu ni nipa aiyipada.

Àwọn apá tí ó wọ́pọ̀

  • Olona-dada housings
  • Awọn aaye ti o nira
  • Awọn ẹya ti o nilo diẹ setups
  • Awọn iho igun
  • Ïîõîåå íà ýòîò ñ÷ ̧ò (ò.ê.
  • Awọn ibaraẹnisọrọ ọkan-nkan

Awọn ohun elo ati awọn ipari

  • 7075 — 拼音:yī gè yǒu yī gè
  • 6061 — Awọn ile ti o nira
  • 304 — Õî÷ó ïîìî÷ü, ÷òî ó ìåíÿ íåò íèêàêèõ
  • POM — olona-oju ina- ṣiṣu

DFM: datum eni, free roboto, setups

  • Kọ eto datum; maṣe ṣe ifarada awọn aaye ọfẹ
  • Igbesẹ lati ṣe atunyẹwo ọpa arọwọto
  • Ṣe afẹyinti awọn oju ati ki o fi sori ẹrọ lori awoṣe naa.
  • CMM bi itọkasi — ko aiyipada ni kikun-iwọn ọlọjẹ

Ayewo ati awọn iwe aṣẹ (bi ticked)

  • Ijabọ onisẹpo bi a ti ṣe afihan
  • FAI bi ticked
  • CMM bi ticked
  • Awọn ohun elo certifis fun adehun aṣẹ

Asiwaju akoko (aago bẹrẹ ni isanwo node)

Awọn ipele asiwaju: Aje / Standard / Express. Standard jẹ nipa awọn ọjọ iṣẹ 10 bi itọkasi; Express nipa 6 nigbati agbara ba gba laaye.

Aago naa bẹrẹ ni ipade isanwo ti a gba. Anodize, lulú, passivate, ati awọn ọjọ itọju ooru ti ita joko lori aago yẹn.

Titanium, ẹwu lile ti o nipọn, awọn ifibọ, ati awọn wiwọn ti o nira tun ṣe aago. Aworan ti o nipọn n ṣakoso.

Ohun ti a ko ṣe

  • Ko si ọkọ ofurufu ti o ṣe pataki tabi ITAR nipasẹ aiyipada
  • Ko si AS / ISO ti a ṣe
  • Ïîýòîìó ýòîò ñ÷åò íàõîäèòñÿ íà ñàìîì äåëå.
  • Ko gbogbo awọn ẹya ara ẹrọ ti o wa ni isalẹ ni o wa lori 5-axis

FAQ

Ṣé o ṣe àtòjọ àwọn nọ́mbà ISO / AS / FDA níbí?

Kò sí àwọn nọ́mbà tí a ṣàwárí. Àwọn ètò tí a kò pa mọ́ ni a kò kọ bí wọ́n ṣe pa mọ́. A lè ṣètò àbẹ̀wò ilé-iṣẹ́.

Ṣé o gba pc 1?

Bẹ́ẹ̀ni. Lẹ́yìn CAD o gba ìtọ́kasí AI itemized; àwọn àṣẹ tí ó dúró ṣinṣin tẹ̀lé àwòrán àti nọ́ńbà ìsanwó.

Ìgbà wo ni agogo aṣáájú náà máa bẹ̀rẹ̀?

Ní ibi ìsanwó tí wọ́n bá gbà. Anodize, powder, passivate days sit on the clock. Àwọn ìpele lórí gbólóhùn náà: Ìjìnlẹ̀ ọrọ̀-ajé/ Standard / Express.

À ïî÷åìó ç 5 ìåñÿöåâ íàõîäèòñÿ íà ñàìîì äåëå?

Rárá. A ṣe ayẹwo rẹ nigbati awọn ẹya nilo awọn iṣeto diẹ tabi awọn oju ti o nira.

Awọn ẹya ti o ṣe pataki fun ọkọ ofurufu?

Kii ṣe nipasẹ aiyipada. Iwọn yoo jẹ adehun ọtọtọ — ati pe a ko ṣẹda awọn nọmba AS.

Is every complex part a 5-axis job?

Not always — some parts are cheaper with smart 3-axis setups. We recommend the economical path after DFM.

What does ~6 days express mean?

A reference split: production + international shipping sketch for the Express tier. Actual dates depend on material, finish, queue, and carrier — shown itemized on your quote.

Do you show ISO certificates on this landing?

Only when a verifiable copy is available for qualified buyers. We emphasize NDA, inspection options, and factory-direct service.

What is 5-axis CNC machining?

The tool or table moves in five degrees of freedom so complex faces can be reached in fewer setups than 3-axis — useful for compound angles and organic surfaces.

What travel / envelope should I expect?

Envelope depends on the assigned machine after DFM. Share overall size early; oversized parts are reviewed before acceptance.

Why does 5-axis often cost more?

Programming, fixtures, and spindle time are higher — but fewer setups can reduce total cost vs multi-setup 3-axis. We recommend the cheaper valid path after DFM.

Which finishes work on 5-axis parts?

Same atlas as milling: as-machined, blast, anodize (Al), passivate (SS), powder, polish. Finish days add to the production clock — see Materials & finishes.

What files work best?

Native STEP preferred so we can evaluate tool access; PDF drawings for GD&T and notes.

Upload CAD for an itemized reference

AI Instant Quote + engineer backup in business hours. No 3D printing / injection / die casting.

AIQuoteEmail
PDF

Imeeli iṣẹ ti o fẹ ([email protected]). Imeeli ti ara ẹni dara. Aṣayan — igbasilẹ naa tun n ṣiṣẹ.

A yoo lo imeeli iṣẹ yii nikan lati firanṣẹ nkan yii ati lati dahun awọn ibeere imọ-ẹrọ rẹ (agbasọ, akoko asiwaju, awọn yiya).

5-ipo CNC Dongguan, China | Awọn oju ti o nira Diẹ Awọn iṣeto | Konge Zoryra