STEP / STL / IGES — preview before sign-in.
Zoryra Precision
5-Axis CNC long Dongguan, Saina | Zoryra Precision
Zoryra Precision 5-axis long Dongguan, Saina: ol pes i gat planti samting long en, ol hap i gat planti sait, na i no gat planti setup. NDA na CMM i opsenel. Em i no bikpela samting long flai. Nogat ol AS/ISO namba we ol i wokim.
- Liklik setup
- Ol kompleks pes
- Bekap bilong enjinia
- FAI / CMM opsenel

Three steps to start
Material, qty, finish, lead tier, inspection.
Escalate complex jobs; Dongguan, China produce & ship.
Lead time split
Express reference ≈ 3 days production + 3 days shipping sketch ≈ 6 days total. Standard ≈ 10 days. Quotes always show production and shipping separately.
Long-tail use cases
Common quote paths: robotics EOAT with compound angles, UAV arm connectors, AI cold plates / GPU brackets, electronics housings with undercuts, and non-implant medical interfaces — see industry pages + problem guides, then upload STEP.
When 5-axis helps
Compound angles, deep undercuts reachable in one setup, and organic surfaces that are costly on 3-axis. We still recommend 3-axis when it is cheaper after DFM.
Quality docs & privacy
CAD privacy / NDA options, dimensional reports, FAI, and CMM on request. Factory-direct Dongguan, China. Certification details are shared when available for qualified buyers.
Datum & inspection
Define datum schemes clearly. Fine targets around ±0.002 mm / down to 0.001 mm capability are common with optional CMM / dimensional reports selected in the quote.
Category depth
Pair this page with materials & finishes, industries, milling, and turning hubs — same transparent quote engine everywhere.
Engineering review
5-axis jobs often need DFM alignment — live chat or email within 12 business hours. Large STEP files belong in Upload for quote.
Capability specs & DFM
| Item | Spec |
|---|---|
| Ol kes bilong yusim | Ol kompleks pes, ol hap we i gat planti pes, liklik setup tasol |
| Tolerans mak | ±0.002 mm gutpela mak we i save kamap wantaim CMM sekim |
| Ol samting | Aluminium, steinles, tul ain, plastik |
| Min samting | Diamita bilong tul na mak bilong en i no bikpela tumas — serim STEP pastaim |
| DFM tip | Tok klia long 'datum scheme'; abrusim ol fri ples we i gat planti hevi tumas |
Husat i wokim masin long en, na we
Ol hap bilong en i kam long faktori stret long Dongguan Zerui Precision Manufacturing Co., Ltd. long Dongguan, Saina, Guangdong. Ausait bren: ZORYRA / Zoryra Precision.
Stat long 1 pc. Bihain long CAD upload yu kisim wanpela AI itemized refrens; ol strongpela oda i bihainim droing na pemen node we ol i wanbel long en. Mipela i no save givim ol poto bilong ol narapela diwai olsem lain bilong mipela.
Dispela pes i no soim ol ISO / AS / FDA namba we ol i bin wokim. Ol sistem we mipela i no holim ol i no raitim olsem ol i holim. Yu ken stretim rot bilong go lukim faktori.
Zoryra Precision 5-axis long Dongguan, Saina: ol pes i gat planti samting long en, ol hap i gat planti sait, na i no gat planti setup. NDA na CMM i opsenel. Em i no bikpela samting long flai. Nogat ol AS/ISO namba we ol i wokim.
Ol kompleks pes na ol multi-sait hap i yusim 5-aksis long katim ol setup. Noken larim ol samting we i no gat planti samting long en; raitim ol data na salim STEP pastaim. Em i no bikpela samting long flai.
Ol kain hap
- Ol haus we i gat planti pes
- Ol kompleks pes
- Ol straksa we i no gat planti setup
- Ol hul i gat kona
- Impeller-adjacent (i no flait-kritikal)
- Ol intafeis bilong wanpela hap tasol
Ol samting na pinis
- 7075 — strongpela, liklik setup
- 6061 — ol kompleks haus
- 304 — multi-face stainless, passivete
- POM — plastik bilong enjiniaring we i gat planti pes
DFM: datum skim, ol fri pes, ol setup
- Raitim 'datum scheme'; noken karim tumas ol fri ples
- STEP long glasim tul reach
- Makim ol pes bilong klem na ol samting bilong pasim long model
- CMM olsem ol i bin makim — i no wanpela ful-sais skenim
Inspeksen na ol pepa (olsem ol i makim)
- Ripot bilong sais olsem mak
- FAI olsem mak
- CMM olsem mak
- Ol setifiket bilong ol samting long agrimen bilong oda
Lid taim (klok i stat long pemen node)
Ol bikpela lain: Ekonomi / Standet / Ekspres. Standet em i olsem 10-pela wok de olsem wanpela refrens; Tokaut long 6 taim inap.
Klok i stat long 'payment node' we yu bin wanbel long en. Ol de bilong 'anodize', 'powder', 'passivete', na 'outsourced heat-treat' i stap long dispela klok.
Titanium, tikpela hat-kot, ol inset, na ol kompleks 'gauge' i save 're-clock'. Sket bilong tok i bosim.
Samting mipela i no save mekim
- Em i no bikpela samting long balus o ITAR long difolt
- Nogat AS/ISO ol i bin kamapim
- Ol implant i no stap insait long skop
- I no olgeta hap we ol i wokim long 5-pela 'axis'
FAQ
Yu listim ol ISO / AS / FDA namba hia?
Nogat ol namba we ol i bin kamapim. Ol sistem we mipela i no holim ol i no raitim olsem ol i holim. Yu ken stretim rot bilong go lukim faktori.
Yu save kisim 1 pc?
Yes. Bihain long CAD yu kisim wanpela AI itemized refrens; ol strongpela oda i bihainim 'drowing' na 'payment node'.
Wanem taim 'lead clock' i save stat?
Long 'payment node' we yu wanbel long en. Ol de bilong 'anodize', 'powder', 'passivete' i save stap long klok. Ol lain long dispela kwot: Ekonomi / Standet / Ekspres.
5-aksis em i 'default'?
Nogat. Mipela i save skelim taim ol samting i nidim liklik setup o kompleks pes.
Ol bikpela hap bilong balus?
Nogat long 'default'. Skop bai i stap olsem wanpela seperet agrimen — na mipela i no save kamapim ol AS namba.
Is every complex part a 5-axis job?
Not always — some parts are cheaper with smart 3-axis setups. We recommend the economical path after DFM.
What does ~6 days express mean?
A reference split: production + international shipping sketch for the Express tier. Actual dates depend on material, finish, queue, and carrier — shown itemized on your quote.
Do you show ISO certificates on this landing?
Only when a verifiable copy is available for qualified buyers. We emphasize NDA, inspection options, and factory-direct service.
What is 5-axis CNC machining?
The tool or table moves in five degrees of freedom so complex faces can be reached in fewer setups than 3-axis — useful for compound angles and organic surfaces.
What travel / envelope should I expect?
Envelope depends on the assigned machine after DFM. Share overall size early; oversized parts are reviewed before acceptance.
Why does 5-axis often cost more?
Programming, fixtures, and spindle time are higher — but fewer setups can reduce total cost vs multi-setup 3-axis. We recommend the cheaper valid path after DFM.
Which finishes work on 5-axis parts?
Same atlas as milling: as-machined, blast, anodize (Al), passivate (SS), powder, polish. Finish days add to the production clock — see Materials & finishes.
What files work best?
Native STEP preferred so we can evaluate tool access; PDF drawings for GD&T and notes.
Other capabilities
Upload CAD for an itemized reference
AI Instant Quote + engineer backup in business hours. No 3D printing / injection / die casting.
