Typical parts
Brushless motor mounts (M2/M3 patterns) · Gimbal / camera damping brackets · Arm-to-frame connectors · Battery tray slide rails & latches
Zoryra Precision
Weight-first milling for flight hardware — pocketing strategy, anodize keep-outs, and honest lead tiers for 1–50 pc pilot batches.

UAV buyers iterate fast on motor mounts, gimbal brackets, arm connectors, and battery rails. Share mass targets and mating faces early — we flag thin-wall and anodize risks in DFM before chips fly.
Material path: Al6061-T6 for most structures; 7075 when strength per gram matters (motor mounts, landing gear). Finish: clear / black anodize common; mask threads and arm mating faces unless drawn.
Process: 3-axis pocketing for most brackets; 5-axis when compound arm angles or undercuts reduce setups. Standard tier ≈ 10 days reference (production + air sketch) with anodize on the clock.
See anonymized cases below — arm connector, motor mount, gimbal bracket, battery tray — then upload STEP for an itemized reference quote.
Brushless motor mounts (M2/M3 patterns) · Gimbal / camera damping brackets · Arm-to-frame connectors · Battery tray slide rails & latches
Structural mounting ±0.05 mm typical; bearing / shaft bores per drawing (H7 common); flat damping faces 0.05–0.1 mm when called out. Drawing governs.
Weight targets · Thin-wall notes · Anodize color + masking · 1–50 pc batches
Structural mounting ±0.05 mm typical; bearing / shaft bores per drawing (H7 common); flat damping faces 0.05–0.1 mm when called out. Drawing governs.
మెటీరియల్ · క్లిష్టమైన టోల్. · నిజాయితీ CNC పరిధి. కేసు కోసం కార్డ్ని తెరవండి లేదా కోట్ చేయడానికి STEPని అప్లోడ్ చేయండి. చిత్రాలు పార్ట్ ఇలస్ట్రేషన్లు, థర్డ్-పార్టీ ఫ్యాక్టరీ షాట్లు కాదు.
6061 for most quadcopter mounts; 7075 when strength per gram or thread pull-out is critical — note it on the RFQ for accurate lead & cost.
Yes — mark keep-out faces on the PDF; we mask threads and arm interfaces before anodize by default unless the drawing says otherwise.
Standard ≈ 8–10 days reference with clear/black anodize (production + air sketch). Express when blanks are ready and finish is light.
Yes — upload STEP; we quote 3-axis vs 5-axis in DFM when undercuts or compound angles would otherwise need multiple setups.
AI Instant Reference Quote + engineering review within 12 business hours.
పని ఇమెయిల్ ప్రాధాన్యత ([email protected]). వ్యక్తిగత మెయిల్ సరే. ఐచ్ఛికం - డౌన్లోడ్ ఇప్పటికీ పని చేస్తుంది.
మేము ఈ అంశాన్ని పంపడానికి మరియు మీ ఇంజనీరింగ్ ప్రశ్నలకు (కోట్, లీడ్ టైమ్, డ్రాయింగ్లు) సమాధానమివ్వడానికి మాత్రమే ఈ వర్క్ ఇమెయిల్ని ఉపయోగిస్తాము.