STEP / STL / IGES — preview before sign-in.
Zoryra Precision
5-Axis CNC huko Dongguan, Uchina | Zoryra Precision
Mhimili wa Zoryra Precision 5 huko Dongguan, Uchina: nyuso changamano, sehemu zenye pande nyingi, mipangilio machache. NDA na CMM ya hiari. Sio muhimu sana kwa safari ya ndege kwa chaguomsingi. Hakuna nambari za AS/ISO zilizobuniwa.
- Mipangilio chache
- Nyuso tata
- Nakala ya mhandisi
- FAI / CMM ya hiari

Three steps to start
Material, qty, finish, lead tier, inspection.
Escalate complex jobs; Dongguan, China produce & ship.
Lead time split
Express reference ≈ 3 days production + 3 days shipping sketch ≈ 6 days total. Standard ≈ 10 days. Quotes always show production and shipping separately.
Long-tail use cases
Common quote paths: robotics EOAT with compound angles, UAV arm connectors, AI cold plates / GPU brackets, electronics housings with undercuts, and non-implant medical interfaces — see industry pages + problem guides, then upload STEP.
When 5-axis helps
Compound angles, deep undercuts reachable in one setup, and organic surfaces that are costly on 3-axis. We still recommend 3-axis when it is cheaper after DFM.
Quality docs & privacy
CAD privacy / NDA options, dimensional reports, FAI, and CMM on request. Factory-direct Dongguan, China. Certification details are shared when available for qualified buyers.
Datum & inspection
Define datum schemes clearly. Fine targets around ±0.002 mm / down to 0.001 mm capability are common with optional CMM / dimensional reports selected in the quote.
Category depth
Pair this page with materials & finishes, industries, milling, and turning hubs — same transparent quote engine everywhere.
Engineering review
5-axis jobs often need DFM alignment — live chat or email within 12 business hours. Large STEP files belong in Upload for quote.
Capability specs & DFM
| Item | Spec |
|---|---|
| Tumia kesi | Nyuso tata, sehemu zenye nyuso nyingi, mipangilio machache |
| Lengo la uvumilivu | ±0.002 mm malengo ya faini yanayofanana na hundi ya CMM |
| Nyenzo | Alumini, chuma cha pua, plastiki |
| Kipengele kidogo | Kipenyo cha zana na fikia kikomo — shiriki STEP mapema |
| Kidokezo cha DFM | Fafanua mpango wa kumbukumbu kwa uwazi; epuka kuvumilia zaidi nyuso za bure |
Nani anaitengeneza, na wapi
Sehemu ni za kiwandani moja kwa moja kutoka kwa Dongguan Zerui Precision Manufacturing Co., Ltd. huko Dongguan, Uchina, Guangdong. Chapa ya nje: ZORYRA / Zoryra Precision.
Kutoka kwa pc 1. Baada ya upakiaji wa CAD unapata rejeleo maalum la AI; maagizo ya kampuni hufuata mchoro na nodi ya malipo iliyokubaliwa. Hatupitishi picha za mimea ya watu wengine kama mstari wetu.
Ukurasa huu hauonyeshi nambari za ISO / AS / FDA zilizobuniwa. Mifumo tusiyoshikilia haijaandikwa kama inavyoshikiliwa. Ziara za kiwanda zinaweza kupangwa.
Mhimili wa Zoryra Precision 5 huko Dongguan, Uchina: nyuso changamano, sehemu zenye pande nyingi, mipangilio machache. NDA na CMM ya hiari. Sio muhimu sana kwa safari ya ndege kwa chaguomsingi. Hakuna nambari za AS/ISO zilizobuniwa.
Nyuso tata na sehemu zenye pande nyingi hutumia mhimili 5 kukata mipangilio. Usivumilie zaidi nyuso za bure; andika data na tuma HATUA mapema. Sio muhimu sana kwa safari ya ndege kwa chaguomsingi.
Sehemu za kawaida
- Nyumba zenye nyuso nyingi
- Nyuso tata
- Miundo ya usanidi machache
- Mashimo yenye pembe
- Impeller-inayopakana (sio muhimu sana kwa ndege)
- Miunganisho ya kipande kimoja
Nyenzo na faini
- 7075 — uwezo wa juu, usanidi mdogo
- 6061 — makazi tata
- 304 — uso-nyingi usio na pua, pitapita
- POM — plastiki ya uhandisi ya nyuso nyingi
DFM: mpango wa kumbukumbu, nyuso zisizolipishwa, usanidi
- Andika mpango wa kumbukumbu; usizidi uvumilivu wa nyuso za bure
- HATUA ili kukagua ufikiaji wa zana
- Weka alama kwenye nyuso za kubana na vizuizi kwenye muundo
- CMM kama ilivyowekewa tiki - si uchanganuzi chaguomsingi wa ukubwa kamili
Ukaguzi na hati (kama ilivyowekwa alama)
- Ripoti ya vipimo kama ilivyowekewa tiki
- FAI kama ilivyowekwa
- CMM kama ilivyowekwa
- Vyeti vya nyenzo kwa makubaliano ya agizo
Saa ya kuongoza (saa huanza kwenye nodi ya malipo)
Viwango vya kuongoza: Uchumi / Kawaida / Express. Kawaida ni takriban siku 10 za kazi kama marejeleo; Eleza kuhusu 6 wakati uwezo unaruhusu.
Saa huanza kwenye eneo la malipo lililokubaliwa. Anodize, poda, passivate, na siku za nje za kutibu joto hukaa kwenye saa hiyo.
Titanium, koti gumu nene, viingilio na vipimo changamano tumia tena saa. Mchoro wa kunukuu unatawala.
Kile ambacho hatufanyi
- Sio muhimu sana kwa safari ya ndege au ITAR kwa chaguomsingi
- Hakuna AS/ISO iliyovumbuliwa
- Vipandikizi nje ya upeo
- Si kila sehemu iliyosagwa ina mhimili-5
FAQ
Je, unaorodhesha nambari za ISO / AS / FDA hapa?
Hakuna nambari zilizovumbuliwa. Mifumo tusiyoshikilia haijaandikwa kama inavyoshikiliwa. Ziara za kiwanda zinaweza kupangwa.
Je, unachukua pc 1?
Ndiyo. Baada ya CAD kupata rejeleo la bidhaa za AI; maagizo ya kampuni hufuata mchoro na nodi ya malipo.
Saa ya kuongoza huanza lini?
Katika eneo la malipo lililokubaliwa. Anodize, poda, siku za kupita kukaa kwenye saa. Viwango kwenye nukuu: Uchumi / Standard / Express.
Je, mhimili 5 ndio chaguo msingi?
Hapana. Tunaitathmini wakati vipengele vinahitaji usanidi mdogo au nyuso changamano.
Sehemu muhimu za ndege?
Si kwa chaguomsingi. Upeo unaweza kuwa makubaliano tofauti - na hatuzuii nambari za AS.
Is every complex part a 5-axis job?
Not always — some parts are cheaper with smart 3-axis setups. We recommend the economical path after DFM.
What does ~6 days express mean?
A reference split: production + international shipping sketch for the Express tier. Actual dates depend on material, finish, queue, and carrier — shown itemized on your quote.
Do you show ISO certificates on this landing?
Only when a verifiable copy is available for qualified buyers. We emphasize NDA, inspection options, and factory-direct service.
What is 5-axis CNC machining?
The tool or table moves in five degrees of freedom so complex faces can be reached in fewer setups than 3-axis — useful for compound angles and organic surfaces.
What travel / envelope should I expect?
Envelope depends on the assigned machine after DFM. Share overall size early; oversized parts are reviewed before acceptance.
Why does 5-axis often cost more?
Programming, fixtures, and spindle time are higher — but fewer setups can reduce total cost vs multi-setup 3-axis. We recommend the cheaper valid path after DFM.
Which finishes work on 5-axis parts?
Same atlas as milling: as-machined, blast, anodize (Al), passivate (SS), powder, polish. Finish days add to the production clock — see Materials & finishes.
What files work best?
Native STEP preferred so we can evaluate tool access; PDF drawings for GD&T and notes.
Other capabilities
Upload CAD for an itemized reference
AI Instant Quote + engineer backup in business hours. No 3D printing / injection / die casting.
