STEP / STL / IGES — preview before sign-in.
Zoryra Precision
5-Axle CNC ee Dongguan, Shiinaha | Zoryra Precision
Zoryra Precision 5-axle ee Dongguan, Shiinaha: wejiyo adag, qaybo dhinacyo badan leh, dejin yar. NDA iyo CMM waa ikhtiyaari. Ma aha mid muhiim ah duulimaadka ahaan. Ma jiraan lambarro AS/ISO oo la maleeyay.
- Dejinta yar
- Dusha sare ee adag
- Kaaliyaha injineerka
- FAI / CMM ikhtiyaari

Three steps to start
Material, qty, finish, lead tier, inspection.
Escalate complex jobs; Dongguan, China produce & ship.
Lead time split
Express reference ≈ 3 days production + 3 days shipping sketch ≈ 6 days total. Standard ≈ 10 days. Quotes always show production and shipping separately.
Long-tail use cases
Common quote paths: robotics EOAT with compound angles, UAV arm connectors, AI cold plates / GPU brackets, electronics housings with undercuts, and non-implant medical interfaces — see industry pages + problem guides, then upload STEP.
When 5-axis helps
Compound angles, deep undercuts reachable in one setup, and organic surfaces that are costly on 3-axis. We still recommend 3-axis when it is cheaper after DFM.
Quality docs & privacy
CAD privacy / NDA options, dimensional reports, FAI, and CMM on request. Factory-direct Dongguan, China. Certification details are shared when available for qualified buyers.
Datum & inspection
Define datum schemes clearly. Fine targets around ±0.002 mm / down to 0.001 mm capability are common with optional CMM / dimensional reports selected in the quote.
Category depth
Pair this page with materials & finishes, industries, milling, and turning hubs — same transparent quote engine everywhere.
Engineering review
5-axis jobs often need DFM alignment — live chat or email within 12 business hours. Large STEP files belong in Upload for quote.
Capability specs & DFM
| Item | Spec |
|---|---|
| Isticmaalka kiisas | Suuradaha adag, qaybo badan oo wejiyo leh, dejin yar |
| Hadafka dulqaadka | ±0.002 mm yoolal fiiqan oo caadi ah iyadoo la hubinayo CMM |
| Qalabka | Aluminium, bir aan daxal lahayn, biraha qalabka, balaastig |
| Astaanta ugu yar | Dhexroorka qalabka & gaarista xadidan — wadaag STEP hore |
| Talo DFM | Si cad u qeex nidaamka tixraaca; ka fogow dulqaad-badan oogaha bilaashka ah |
Yaa mashiinka sameeya, iyo meesha
Qaybuhu waa warshad toos ah oo ka socota Dongguan Zerui Precision Manufacturing Co., Ltd. ee Dongguan, Shiinaha, Guangdong. Brand dibadda: ZORYRA / Zoryra sax.
Laga soo bilaabo 1 pc. Ka dib markii CAD upload aad hesho tixraac AI itemized; amarro adag raac sawirka iyo node lacag bixinta lagu heshiiyay. Ma dhaafno sawirrada dhirta dhinac saddexaad sida khadkayaga.
Boggan ma muujinayo lambarada ISO / AS / FDA ee la soo saaray. Nidaamyada aan hayno looma qoro sida loo qabtay. Booqashooyinka warshadda waa la qaban karaa.
Zoryra Precision 5-axle ee Dongguan, Shiinaha: wejiyo adag, qaybo dhinacyo badan leh, dejin yar. NDA iyo CMM waa ikhtiyaari. Ma aha mid muhiim ah duulimaadka ahaan. Ma jiraan lambarro AS/ISO oo la maleeyay.
Wejiyo adag iyo qaybo dhinacyo badan leh waxay isticmaalaan 5-axle si loogu jaro dejin. Ha ka badin dulqaad-xor ah oogyada; qor datums oo u dir STEP waqtiga hore. Ma aha mid muhiim ah duulimaadka ahaan.
Qaybaha caadiga ah
- Guryaha leh wejiyo badan
- Dusha sare ee adag
- Dhismayaal dejin yar leh
- Godad qaloocan
- Agagaarka impeller (ma aha mid muhiim ah duulimaadka)
- Is-dhexgal hal-jid ah
Qalabka & dhammaystirka
- 7075 — xoog-sare, diyaar-garowyo yar
- 6061 — guryaha adag
- 304 — biriijyada badan ee birta ah, ka-hortagaya daxalka
- POM — bariijyada badan ee caagga injineernimada
DFM: qorshaha datum, dusha bannaan, diyaar-garowyo
- Qor qorshaha datum; ha ka badanayn dulqaadka dusha bannaan
- STEP si aad u eegto gaadhista qalabka
- Calaamadee wajiyada qabsashada iyo meelaha laga hortago ee muunadda
- CMM sida la calaamadeeyay — ma aha iska-caadi baadhis buuxda oo cabbir buuxa ah
Kormeerka iyo dukumentiyada (sida loo calaamadeeyay)
- Warbixinta cabbirka sida lagu saxay
- FAI sida la calaamadeeyay
- CMM sida la calaamadeeyay
- Shahaadooyinka agabka sida heshiiska amarka
Waqtiga hogaaminta (saacada waxay ka bilaabataa goobta lacag-bixinta)
Heerarka hogaaminta: Dhaqaalaha / Heerka / Degdeg. Heerarka caadiga ah waa ku dhawaad 10 maalmood oo shaqo ahaan tusaale ahaan; Degdeg ah ku dhawaad 6 marka awooddu ogolaato.
Saacada waxay ka bilaabataa goobta lacag-bixinta ee la isla ogolyahay. Maalmihii anodize, budada, passivate, iyo kuleylka dibadda loo raro waxay kujiraan saacaddaas.
Titanium, daahan adag oo dhumuc leh, gelinno, iyo qalabyo adag ayaa dib u bilaaba saacadda. Sawirka xigashada ayaa hagaya.
Waxaanan samayn
- Ma aha mid muhiim u ah duulimaadka ama ITAR ahaan iska-caadi
- AS/ISO aan la soo saarin ma jiraan
- Qalabka lagu dhex geliyo waa ka baxsan yahay baaxadda
- Ma aha qayb kasta oo la shiiday in ay ku socoto 5-axis
FAQ
Ma halkan ayaad ku taxdaa lambarrada ISO / AS / FDA?
Ma jiro lambar la maleeyay. Nidaamyada aan haysan lama qoro sidii lahayay. Booqashooyinka warshad waa la qaban karaa.
Ma qaadataa 1 qaybood?
Haa. Ka dib CAD waxaad heshaa tixraac AI oo faahfaahsan; dalabyada adag waxay raacaan sawirka iyo habka lacag bixinta.
Goorma ayuu saacadda hogaamintu bilaabataa?
Xilliga lacag-bixinta la isku raacay. Maalmaha anodize, budada, iyo passivate waa lagu leeyahay saacadda. Heerarka ku jira xigashada: Dhaqaale / Caadi / Degdeg.
Ma 5-axis baa ah iska-caadi?
Maya. Waxaan qiimeynaa marka astaamo u baahan yihiin dhowr dejin oo yar ama wejiyo adag.
Qaybaha muhiimka u ah duulimaadka?
Maya si caadi ah. Baaxadda waxay noqon lahayd heshiis gooni ah — mana sameynno lambarada AS.
Is every complex part a 5-axis job?
Not always — some parts are cheaper with smart 3-axis setups. We recommend the economical path after DFM.
What does ~6 days express mean?
A reference split: production + international shipping sketch for the Express tier. Actual dates depend on material, finish, queue, and carrier — shown itemized on your quote.
Do you show ISO certificates on this landing?
Only when a verifiable copy is available for qualified buyers. We emphasize NDA, inspection options, and factory-direct service.
What is 5-axis CNC machining?
The tool or table moves in five degrees of freedom so complex faces can be reached in fewer setups than 3-axis — useful for compound angles and organic surfaces.
What travel / envelope should I expect?
Envelope depends on the assigned machine after DFM. Share overall size early; oversized parts are reviewed before acceptance.
Why does 5-axis often cost more?
Programming, fixtures, and spindle time are higher — but fewer setups can reduce total cost vs multi-setup 3-axis. We recommend the cheaper valid path after DFM.
Which finishes work on 5-axis parts?
Same atlas as milling: as-machined, blast, anodize (Al), passivate (SS), powder, polish. Finish days add to the production clock — see Materials & finishes.
What files work best?
Native STEP preferred so we can evaluate tool access; PDF drawings for GD&T and notes.
Other capabilities
Upload CAD for an itemized reference
AI Instant Quote + engineer backup in business hours. No 3D printing / injection / die casting.
