STEP / STL / IGES — preview before sign-in.
Zoryra Precision
5-Axis CNC muDongguan, China | Zoryra Precision
Zoryra Precision 5-axis muDongguan, China: zviso zvakaoma, akawanda-mativi zvikamu, mashoma setups. NDA uye CMM zvingasarudzwa. Kwete kubhururuka-kwakakosha nekukasira. Hapana akagadzirwa AS/ISO manhamba.
- Maseta mashoma
- Complex surfaces
- Engineer backup
- FAI / CMM sarudzo

Three steps to start
Material, qty, finish, lead tier, inspection.
Escalate complex jobs; Dongguan, China produce & ship.
Lead time split
Express reference ≈ 3 days production + 3 days shipping sketch ≈ 6 days total. Standard ≈ 10 days. Quotes always show production and shipping separately.
Long-tail use cases
Common quote paths: robotics EOAT with compound angles, UAV arm connectors, AI cold plates / GPU brackets, electronics housings with undercuts, and non-implant medical interfaces — see industry pages + problem guides, then upload STEP.
When 5-axis helps
Compound angles, deep undercuts reachable in one setup, and organic surfaces that are costly on 3-axis. We still recommend 3-axis when it is cheaper after DFM.
Quality docs & privacy
CAD privacy / NDA options, dimensional reports, FAI, and CMM on request. Factory-direct Dongguan, China. Certification details are shared when available for qualified buyers.
Datum & inspection
Define datum schemes clearly. Fine targets around ±0.002 mm / down to 0.001 mm capability are common with optional CMM / dimensional reports selected in the quote.
Category depth
Pair this page with materials & finishes, industries, milling, and turning hubs — same transparent quote engine everywhere.
Engineering review
5-axis jobs often need DFM alignment — live chat or email within 12 business hours. Large STEP files belong in Upload for quote.
Capability specs & DFM
| Item | Spec |
|---|---|
| Shandisa makesi | Complex surfaces, multi-face parts, mashoma setups |
| Kushivirira chinangwa | ± 0.002 mm zvibodzwa zvakanaka zvakajairika neCMM cheki |
| Zvishandiso | Aluminium, Stainless, tool steels, mapurasitiki |
| Min feature | Tool dhayamita & kusvika zvishoma - govera STEP nekukurumidza |
| DFM zano | Tsanangura datum scheme zvakajeka; dzivisa kunyanya kushivirira nzvimbo dzakasununguka |
Ndiani anoigadzira, uye kupi
Zvikamu ndezvefekitari-zvakananga kubva kuDongguan Zerui Precision Manufacturing Co., Ltd. muDongguan, China, Guangdong. Chiratidzo chekunze: ZORYRA / Zoryra Precision.
Kubva 1 pc. Mushure meCAD kurodha iwe unowana AI itemized reference; mirairo yakasimba inotevera kudhirowa uye iyo yakabvumiranwa kubhadhara node. Isu hatipfuure wechitatu-bato chirimwa mafoto semutsetse wedu.
Iri peji rinoratidza hapana akagadzirwa ISO / AS / FDA nhamba. MaSystem atisina kubata haana kunyorwa sekubatwa. Kushanya kwemafekitari kunogona kurongwa.
Zoryra Precision 5-axis muDongguan, China: zviso zvakaoma, akawanda-mativi zvikamu, mashoma setups. NDA uye CMM zvingasarudzwa. Kwete kubhururuka-kwakakosha nekukasira. Hapana akagadzirwa AS/ISO manhamba.
Zviso zvakaomarara uye akawanda-parutivi zvikamu zvinoshandisa 5-axis kucheka setups. Usanyanya-kushivirira nzvimbo dzakasununguka; nyora datum uye tumira STEP nekukurumidza. Kwete kubhururuka-kwakakosha nekukasira.
Zvimwe zvikamu
- Multi-face housings
- Complex surfaces
- Zvishoma-zvigadziriso zvimiro
- Makomba ane angled
- Impeller-yakatarisana (kwete ndege-yakakosha)
- Imwe-chidimbu interfaces
Materials & finishes
- 7075 — yakakwirira-simba, mashoma setups
- 6061 — dzimba dzakaoma
- 304 — multi-face isina tsvina, passivate
- POM — multi-face engineering plastiki
DFM: datum scheme, nzvimbo dzemahara, setups
- Nyora iyo datum scheme; usanyanya-kushivirira nzvimbo dzakasununguka
- STEP yekuongorora kusvika kune chishandiso
- Maka zviso zvinosungirirana uye zvichengetedze-kunze pane modhi
- CMM semakaki - kwete yakasarudzika yakazara saizi scan
Kuongorora uye zvinyorwa (sezvamaka)
- Dimensional report semaki
- FAI sezvakarongwa
- CMM sezvakarongwa
- Material certs pachibvumirano cheodha
Nguva yekutungamira (wachi inotanga panzvimbo yekubhadhara)
Lead tiers: Economy / Standard / Express. Standard ndeye 10 mazuva ekushanda sereferensi; Taura nezve 6 kana huwandu hunobvumira.
Wachi inotangira pane yakabvumiranwa kubhadhara node. Anodize, hupfu, passivate, uye outsourced kupisa-kubata mazuva anogara pawachi iyoyo.
Titanium, gobvu rakaoma-jasi, kuisa, uye geji yakaoma re-wachi. Iyo quote sketch inotonga.
Zvatisingaite
- Kwete kubhururuka-kwakakosha kana ITAR nekukasira
- Hapana yakagadzirwa AS/ISO
- Maimplants kunze kwechikamu
- Haisi yega yega yakagayiwa chikamu chinomhanya 5-axis
FAQ
Iwe unonyora ISO / AS / FDA nhamba pano?
Hapana nhamba dzakagadzirwa. MaSystem atisina kubata haana kunyorwa sekubatwa. Kushanya kwemafekitari kunogona kurongwa.
Iwe unotora 1 pc here?
Ehe. Mushure meCAD unowana AI itemized reference; mirairo yakasimba inotevera kudhirowa uye node yekubhadhara.
Wachi inotungamira inotanga riini?
Panzvimbo yekubhadhara yakabvumiranwa. Anodize, hupfu, passivate days gara pawachi. Tiers pane quote: Economy / Standard / Express.
Ko 5-axis ndiyo yekutanga?
Kwete. Tinozviongorora kana maficha achida mashoma ekugadzirisa kana zviso zvakaoma.
Zvikamu zvakakosha zvekubhururuka?
Kwete by default. Scope ingave chibvumirano chakasiyana - uye isu hatigadziri nhamba dzeAS.
Is every complex part a 5-axis job?
Not always — some parts are cheaper with smart 3-axis setups. We recommend the economical path after DFM.
What does ~6 days express mean?
A reference split: production + international shipping sketch for the Express tier. Actual dates depend on material, finish, queue, and carrier — shown itemized on your quote.
Do you show ISO certificates on this landing?
Only when a verifiable copy is available for qualified buyers. We emphasize NDA, inspection options, and factory-direct service.
What is 5-axis CNC machining?
The tool or table moves in five degrees of freedom so complex faces can be reached in fewer setups than 3-axis — useful for compound angles and organic surfaces.
What travel / envelope should I expect?
Envelope depends on the assigned machine after DFM. Share overall size early; oversized parts are reviewed before acceptance.
Why does 5-axis often cost more?
Programming, fixtures, and spindle time are higher — but fewer setups can reduce total cost vs multi-setup 3-axis. We recommend the cheaper valid path after DFM.
Which finishes work on 5-axis parts?
Same atlas as milling: as-machined, blast, anodize (Al), passivate (SS), powder, polish. Finish days add to the production clock — see Materials & finishes.
What files work best?
Native STEP preferred so we can evaluate tool access; PDF drawings for GD&T and notes.
Other capabilities
Upload CAD for an itemized reference
AI Instant Quote + engineer backup in business hours. No 3D printing / injection / die casting.
