STEP / STL / IGES — preview before sign-in.
Zoryra Precision
5-Axis CNC i Dongguan, Saina | Zoryra Precision
Zoryra Precision 5-axis i Dongguan, Saina: foliga faigata, vaega tele itu, seti-lagona itiiti. NDA ma CMM e mafai ona filifilia. Le masani ona taua mo vaalele. Leai ni numera AS/ISO fou.
- Laʻititi le sauniuni
- Lavelave luga
- Faʻamautu inisinia
- FAI / CMM e filifili

Three steps to start
Material, qty, finish, lead tier, inspection.
Escalate complex jobs; Dongguan, China produce & ship.
Lead time split
Express reference ≈ 3 days production + 3 days shipping sketch ≈ 6 days total. Standard ≈ 10 days. Quotes always show production and shipping separately.
Long-tail use cases
Common quote paths: robotics EOAT with compound angles, UAV arm connectors, AI cold plates / GPU brackets, electronics housings with undercuts, and non-implant medical interfaces — see industry pages + problem guides, then upload STEP.
When 5-axis helps
Compound angles, deep undercuts reachable in one setup, and organic surfaces that are costly on 3-axis. We still recommend 3-axis when it is cheaper after DFM.
Quality docs & privacy
CAD privacy / NDA options, dimensional reports, FAI, and CMM on request. Factory-direct Dongguan, China. Certification details are shared when available for qualified buyers.
Datum & inspection
Define datum schemes clearly. Fine targets around ±0.002 mm / down to 0.001 mm capability are common with optional CMM / dimensional reports selected in the quote.
Category depth
Pair this page with materials & finishes, industries, milling, and turning hubs — same transparent quote engine everywhere.
Engineering review
5-axis jobs often need DFM alignment — live chat or email within 12 business hours. Large STEP files belong in Upload for quote.
Capability specs & DFM
| Item | Spec |
|---|---|
| Faʻaaogaina tulaga | Suface faigata, vaega e tele mata, seti laʻititi |
| Sini o le faapalepale | ±0.002 mm sini lelei masani ma siaki CMM |
| Mea | Alumini, uamea ie le eleelea, uamea meafaigaluega, palasitika |
| Vaega laʻititi | Ole lautele ma le aapa o meafaigaluega e faʻamaʻoti — tufatufaina STEP i le amataga |
| Fautuaga DFM | Faʻailoa manino le faiga datum; aloese mai le tele o le faʻatapulaʻa i luga o luga saoloto |
O ai e masini ma le ā le nofoaga
Vaega e tuusao fale gaosi mai Dongguan Zerui Precision Gaosi Co., Ltd i Dongguan, Saina, Guangdong. Faʻailoga i fafo: ZORYRA / Zoryra Precision.
Mai le 1 pc. ina ua uma CAD upload e te maua se AI itemized faasino; poloaiga mausali mulimuli i le ata ma le maliega totogiina node. Matou te le tuʻuina atu ata o le vaega lona tolu o le laʻau e pei o la matou laina.
O lenei itulau e leai ni numera ISO / AS / FDA na faia. O faiga tatou te le tausia e le o tusia e pei ona taofia. E mafai ona faatulaga asiasiga fale gaosi.
Zoryra Precision 5-axis i Dongguan, Saina: foliga faigata, vaega tele itu, seti-lagona itiiti. NDA ma CMM e mafai ona filifilia. Le masani ona taua mo vaalele. Leai ni numera AS/ISO fou.
O foliga faigata ma vaega tele itu e faaaoga ai le 5-axis e tipi i seti. Aua le sili atu i le faaletonu luga e leai se tapulaa; tusia datums ma lafo STEP i le vave. Le masani ona taua mo vaalele.
Vaega masani
- Fale ma foliga eseese
- Lavelave luga
- Faufale ma seti-lagona itiiti
- Pu faatafafa
- Latitu i impeller (le masani ona taua mo vaalele)
- Uiga o le tasi vaega
Mea & faaiʻuga
- 7075 — maualuga-mafiafia, itiiti nofoaga fa'apipi'i
- 6061 — faletalimalo faigatā
- 304 — ata uʻamea eseese-i luga, togafitia
- POM — plastiki inisinia eseese-i luga
DFM: faiga o datum, luga leai se tapulaʻa, nofoaga fa'apipi'i
- Tusi le faiga o datum; aua le sili atu le tapulaʻa luga leai se totogi
- Laʻasaga e iloilo le umi o meafaigaluega
- Marka foliga faʻapipiʻi ma nofoaga le pasia i luga o le faʻataʻitaʻiga
- CMM pei ona siaki — e le o le suʻesuʻega lapoʻa masani
Siaki ma tusitusiga (e pei ona siaki)
- Lipoti fua faatatau e pei ona siakiina
- FAI pei o le siakiina
- CMM pei o le siakiina
- Tusipasi mea e tusa ai ma le maliega o le poloaiga
Taimi taʻitaʻi (o le uati e amata i le totogiina)
Faʻasologa o taʻitaʻi: Tamaoaiga / Faʻatonutonu / Faaooina vave. O le Standard e tusa ma aso faigaluega e 10 o se faʻasino; O le Faaooina vave e tusa ma le 6 pe a mafai.
E amata le uati i le totogiina na malilie ai. Anodize, efuefu, pasiva, ma aso togafitiga vevela faalapotopotoga ona o lea uati.
Titanium, lalagaina mafiafia faigata-puipui, faʻapipiʻi, ma fua faigata toe amata le uati. O le ata o le upusii e faatonutonu.
O mea tatou te le faia
- E le manaʻomia mo le vaalele poʻo ITAR e masani ai
- Leai ni AS/ISO na faia
- O faʻasologa i totonu o le tulaga e le aofia
- E le o faʻamaeʻa le vaega uma i le 5-axis
FAQ
E te lisiina faʻailoga ISO / AS / FDA iinei?
Leai ni numera fou. Faiga o le a tatou le taofia e le tusia e pei ona taofia. E mafai ona faʻatulagaina asiasiga i fale gaosi.
E te taliaina 1 pc?
Ioe. Ina ua uma CAD e te maua se mea AI faʻavasega; oka mautinoa mulimuli i ata ma le totogi node.
E afea e amata ai le uati taʻitaʻi?
I le node totogi na malilie ai. Anodize, efuefu, aso passivate o loʻo nofo i luga o le uati. Faasologa i luga o le tau: Tamaoaiga / Tulafono / Fa'atumu.
O le 5-axis o le masani?
Leai. Matou te iloiloina pe a manaʻomia e foliga ni faʻatulagaga laʻititi pe foliga faigata.
Vaalele-faʻamuamua vaega?
Leai i le tulaga masani. O le lautele o le a avea ma maliliega ese — ma matou te le foaʻiina numera AS.
Is every complex part a 5-axis job?
Not always — some parts are cheaper with smart 3-axis setups. We recommend the economical path after DFM.
What does ~6 days express mean?
A reference split: production + international shipping sketch for the Express tier. Actual dates depend on material, finish, queue, and carrier — shown itemized on your quote.
Do you show ISO certificates on this landing?
Only when a verifiable copy is available for qualified buyers. We emphasize NDA, inspection options, and factory-direct service.
What is 5-axis CNC machining?
The tool or table moves in five degrees of freedom so complex faces can be reached in fewer setups than 3-axis — useful for compound angles and organic surfaces.
What travel / envelope should I expect?
Envelope depends on the assigned machine after DFM. Share overall size early; oversized parts are reviewed before acceptance.
Why does 5-axis often cost more?
Programming, fixtures, and spindle time are higher — but fewer setups can reduce total cost vs multi-setup 3-axis. We recommend the cheaper valid path after DFM.
Which finishes work on 5-axis parts?
Same atlas as milling: as-machined, blast, anodize (Al), passivate (SS), powder, polish. Finish days add to the production clock — see Materials & finishes.
What files work best?
Native STEP preferred so we can evaluate tool access; PDF drawings for GD&T and notes.
Other capabilities
Upload CAD for an itemized reference
AI Instant Quote + engineer backup in business hours. No 3D printing / injection / die casting.
