DFM for plastics
Avoid ultra-thin walls; specify critical cosmetic faces; share STEP early for soft-jaw strategy.
Zoryra Precision
PEEK, POM, Nylon, PC and more — select in the quote plastics group. Fixturing notes matter for soft plastics.
Avoid ultra-thin walls; specify critical cosmetic faces; share STEP early for soft-jaw strategy.
PEEK, POM, Nylon, PC, and related engineering plastics sit in the quote plastics group. Soft plastics need fixturing notes so clamping does not mark cosmetic faces.
Industrial and medical-adjacent non-implant parts are in scope. Implant programs need separate qualification — we do not treat that as a standard catalog process.
| Item | Spec |
|---|---|
| nga mea mārū | PEEK, POM, Nylon, tuʻanga taʻi… |
| ava o te tatau | ±0.002–0.01 mm tuturu |
| DFM tuʻanga | tuʻanga-tuʻanga tuʻanga nō meangiti tuʻanga |
We support industrial / medical-adjacent non-implant parts. Implant programs need separate qualification.
AI Instant Reference Quote + engineering review within 12 business hours.
Teia api no te tutaki CNC. Akara i te mea, 6061 aramini e te metara kāre e ʻua, tuku i te tau i runga i te tutu, e te nui. Ra 8–10, mei te mea taʻi.
Teia api no te tutaki CNC. Akara i te mea, 6061 aramini e te metara kāre e ʻua, tuku i te tau i runga i te tutu, e te nui. Ra 8–10, mei te mea taʻi.