Engineering first
Titanium often needs tooling and fixturing confirmation. Use Talk to an Engineer for complex envelopes.
Zoryra Precision
Ti6Al4V and related grades for high-strength, light parts — lead time and tooling confirmed by engineering.
Titanium often needs tooling and fixturing confirmation. Use Talk to an Engineer for complex envelopes.
Ti6Al4V is the usual request. Lead time follows Economy / Standard / Express — machining hours are higher, so totals rise even on Standard.
We do not advertise aerospace-flight-critical titanium as a default line. Drawing, heat-treat state, and inspection tier govern each job.
| Item | Spec |
|---|---|
| ayɔn-mak | strong-layt6layt-ayɔn4V ɔdinari |
| luk-bak | injin-wok mashin-pis mashin-pis & wet-tɛm |
| DFM mashin-pis | mashin-pis STEP mashin-pis fɔ mashin-pis mashin-pis |
No — Economy/Standard/Express tiers still apply; machining hours are higher so totals rise.
AI Instant Reference Quote + engineering review within 12 business hours.
Dis pej na fɔ CNC kwot. Kol di tin, lɛk 6061 alyuminiom ɔ stensles, put tolerans na di drowing, ɛn se di nomba. Nɔmal tɛm na 8–10 de, fram wan pis.
Dis pej na fɔ CNC kwot. Kol di tin, lɛk 6061 alyuminiom ɔ stensles, put tolerans na di drowing, ɛn se di nomba. Nɔmal tɛm na 8–10 de, fram wan pis.