Typisk Standard ~10 dage (prod + luftskitse) · Ekspress ~6 dage · titartaaneq / DFM

Zoryra Precision

5-akse CNC-mik Dongguan-imi, Kinami | Zoryra Eqqorluartumik

Zoryra Precision 5-akse Dongguanimi, Kinami: assilisassiat assigiinngitsut, arlalitsigut immikkoortortaqarfiit, ikinnerusunik atortulersuutit. NDA aamma CMM toqqarneqarsinnaapput. Timmisartuussinermut pingaaruteqartuunngilaq. AS/ISO-mik normunik pilersitsisoqanngilaq.

  • Setup-it ikinnerusut
  • Kompleks pinnguaatit
  • Ingeniøritut sillimmaserneq
  • FAI / CMM toqqarneqarsinnaavoq

Three steps to start

1Upload CAD

STEP / STL / IGES — preview before sign-in.

2Configure

Material, qty, finish, lead tier, inspection.

3Confirm

Escalate complex jobs; Dongguan, China produce & ship.

Lead time split

Express reference ≈ 3 days production + 3 days shipping sketch ≈ 6 days total. Standard ≈ 10 days. Quotes always show production and shipping separately.

Long-tail use cases

Common quote paths: robotics EOAT with compound angles, UAV arm connectors, AI cold plates / GPU brackets, electronics housings with undercuts, and non-implant medical interfaces — see industry pages + problem guides, then upload STEP.

When 5-axis helps

Compound angles, deep undercuts reachable in one setup, and organic surfaces that are costly on 3-axis. We still recommend 3-axis when it is cheaper after DFM.

Quality docs & privacy

CAD privacy / NDA options, dimensional reports, FAI, and CMM on request. Factory-direct Dongguan, China. Certification details are shared when available for qualified buyers.

Datum & inspection

Define datum schemes clearly. Fine targets around ±0.002 mm / down to 0.001 mm capability are common with optional CMM / dimensional reports selected in the quote.

Category depth

Pair this page with materials & finishes, industries, milling, and turning hubs — same transparent quote engine everywhere.

Engineering review

5-axis jobs often need DFM alignment — live chat or email within 12 business hours. Large STEP files belong in Upload for quote.

Common materials

7075TitanimikSaattussaq mersunngitsoqIngeniøritut plastikkit
Open materials atlas →

Capability specs & DFM

ItemSpec
AtuineqPiffiit ajornakusoortut, multi-face-mik ilaasut, ikinnerusunik inissititernerit
Toleransimik anguniagaq±0,002 mm-inik fine mål-it CMM-mik misissuinermi nalinginnaasut
AtortussatAluminium, saattussaq mersunngitsoq, atortussiassat, plastikkit
Min funktionAtortup diameteria & angusinnaassusaa killeqarpoq — STEP siusinnerusukkut avitseqatigiissutigiuk
DFM-imik tipDatumskema ersarissumik nassuiaruk; frie pinnguaatit overtoleranseqarnissaat unitsiguk

Kikkut maskiinaqartarpat, aamma sumi

Pigisat tassaapput fabrikkimit toqqaannartumik Dongguan Zerui Precision Manufacturing Co., Ltd.-mit Dongguanimi, Kinami, Guangdongimiittumiit. Avatangiisinut tunngasoq: ZORYRA / Zoryra Eqqorluarneq.

Fr 1 pk. CAD-mik upload-ernerup kingorna AI-mik item-imik najoqqutassiamik pissarsisarputit; firm tillinniarnerit malittarpaat titartagaq aamma isumaqatigiissutigineqarsimasoq akiliisarnermut node. Pinngortitami assilisat tredjeparts-it linje-tut ingerlateqqittarpagut.

Qupperneq una ISO / AS / FDA-mik normunik nassaartoqanngilaq. Systemit tigumminngisavut tigummineqartutut allanneqanngillat. Fabrikkimut pulaarnissaq aaqqissuunneqarsinnaavoq.

Zoryra Precision 5-akse Dongguanimi, Kinami: assilisassiat assigiinngitsut, arlalitsigut immikkoortortaqarfiit, ikinnerusunik atortulersuutit. NDA aamma CMM toqqarneqarsinnaapput. Timmisartuussinermut pingaaruteqartuunngilaq. AS/ISO-mik normunik pilersitsisoqanngilaq.

Kompleks faces aamma multi-side-mik atortut 5-akse atorlugit setup-inik ikkussisarput. Over-toleranseqanngitsumik pinnguaatit; allattukkit datum aamma STEP siusinnerusukkut nassiuk. Timmisartuussinermut pingaaruteqartuunngilaq.

Typisk ilaat

  • Arlalitsigut inissiat
  • Kompleks pinnguaatit
  • Minnerusumik-setup-imik sanaartukkat
  • Vinkel hole
  • Impeller-imut atatillugu (timmisartuussinermut pingaaruteqanngilaq)
  • Ataatsimik atortulersuutit

Atortut & naammassisat

  • 7075 — højstyrke, setup-it ikinnerusut
  • 6061 — inissiat kompleksit
  • 304 — arlalitsigut saattussaq mersunngitsoq, passivit
  • POM — arlalinnik ingeniøritut plastikkimik

DFM: datumskema, frie overflader, setups

  • Datumskema allaguk; overtoleranseqanngitsumik pinnguaatit
  • STEP atortussaq reach-imik nalilersuinissamut
  • Modelimi klampe-t aamma keep-out-it nalunaarsukkit
  • CMM soorlu tikkuarneqartoq — tassaanngilaq standardimik tamakkiisumik scannerneq

Katsorsaaneq aamma allakkiat (soorlu tikkuarneqarsimasoq)

  • Dimensionel nalunaarusiaq soorlu tikkuarneqartoq
  • FAI soorlu tikkuarneqartoq
  • CMM soorlu tikkuarneqartoq
  • Atortussat certs inniminniinermut isumaqatigiissummut ataatsimut

Piffissaq (nalunaaqutaq akiliisarfimmiit aallartissaaq)

Aqutsisut: Aningaasaqarneq / Nalinginnaasoq / Ekspress. Standard tassaavoq ullut suliffiusut 10-t missaanni najoqqutassiatut; Kapaciteti periarfissippagu 6-it missaanni ersersitsigit.

Ulloriarsiorneq isumaqatigiissutigineqarsimasumi akiliisarfimmi aallartissaaq. Anodiserineq, pulver, passiverneq, aammalu avammut kissarsuummik suliaqarnerit ullut taanna nalunaaquttap ingerlanerani issiapput.

Titanium, tykt hard-coat, isertitsissutit, aammalu komplekse målere re-klokke. Quote sketch-i aqutsisuuvoq.

Suna ’ingerlanngilagut’

  • Timmisartuussinermut pingaaruteqartuunngilaq imaluunniit ITAR-iunngilaq
  • AS/ISO-mik nassaartoqanngilaq
  • Implantatit avataaniittut
  • Frese-t tamarmik 5-akse-mik ingerlasarneq ajorput

FAQ

ISO / AS / FDA-mik normunik uani allassimasaqarpit?

Nummerinik nassaartoqanngilaq. Systemit tigumminngisavut tigummineqartutut allanneqanngillat. Fabrikkimut pulaarnissaq aaqqissuunneqarsinnaavoq.

stk tigusarpiuk?

Aap. CAD-p kingorna AI-mik item-imik najoqqutassiamik pissarsisarputit; fast tillinniarnerit malittarpaat titartaasarneq aamma akiliisarneq.

Lead clock qanga aallartisarpa?

Isumaqatigiissutigineqarsimasumi akiliisarfimmi. Anodise, pulver, passive ullut nalunaaquttap ingerlanerani issiapput. Tier-it citat-imi: Aningaasaqarneq / Standard / Ekspress.

5-akse tassaavoq atorneqartoq?

Aap, nalilersortarparput funktionit ikinnerusunik setup-inik imaluunniit komplekse faces-inik pisariaqartitsilerpata.

Timmisartuussinermut pingaaruteqarluinnartut?

Standarditut pinngilaq. Scope tassaassaaq immikkut isumaqatigiissut — aamma AS-nummerinik pilersitsisarpugut.

Is every complex part a 5-axis job?

Not always — some parts are cheaper with smart 3-axis setups. We recommend the economical path after DFM.

What does ~6 days express mean?

A reference split: production + international shipping sketch for the Express tier. Actual dates depend on material, finish, queue, and carrier — shown itemized on your quote.

Do you show ISO certificates on this landing?

Only when a verifiable copy is available for qualified buyers. We emphasize NDA, inspection options, and factory-direct service.

What is 5-axis CNC machining?

The tool or table moves in five degrees of freedom so complex faces can be reached in fewer setups than 3-axis — useful for compound angles and organic surfaces.

What travel / envelope should I expect?

Envelope depends on the assigned machine after DFM. Share overall size early; oversized parts are reviewed before acceptance.

Why does 5-axis often cost more?

Programming, fixtures, and spindle time are higher — but fewer setups can reduce total cost vs multi-setup 3-axis. We recommend the cheaper valid path after DFM.

Which finishes work on 5-axis parts?

Same atlas as milling: as-machined, blast, anodize (Al), passivate (SS), powder, polish. Finish days add to the production clock — see Materials & finishes.

What files work best?

Native STEP preferred so we can evaluate tool access; PDF drawings for GD&T and notes.

Upload CAD for an itemized reference

AI Instant Quote + engineer backup in business hours. No 3D printing / injection / die casting.

AICitatEmail
PDF

Suliffimmi emailik piumaneqarpoq ([email protected]). Personlig maili OK-iuvoq. Pisinnaavoq — download suli sulivoq.

Sulinermut emailik una atortarparput aatsaat nioqqutissamik nassiussinissamut aamma ingeniøritut apeqqutinut akissuteqarnissamut (najoqqutassiaq, piffissaq, titartakkat).

5-akse CNC Dongguan, Kina | Kompleks Ansigter Arlalinnik Setup-inik | Zoryra Eqqorluartumik