STEP / STL / IGES — preview before sign-in.
Zoryra Precision
5-akse CNC-mik Dongguan-imi, Kinami | Zoryra Eqqorluartumik
Zoryra Precision 5-akse Dongguanimi, Kinami: assilisassiat assigiinngitsut, arlalitsigut immikkoortortaqarfiit, ikinnerusunik atortulersuutit. NDA aamma CMM toqqarneqarsinnaapput. Timmisartuussinermut pingaaruteqartuunngilaq. AS/ISO-mik normunik pilersitsisoqanngilaq.
- Setup-it ikinnerusut
- Kompleks pinnguaatit
- Ingeniøritut sillimmaserneq
- FAI / CMM toqqarneqarsinnaavoq

Three steps to start
Material, qty, finish, lead tier, inspection.
Escalate complex jobs; Dongguan, China produce & ship.
Lead time split
Express reference ≈ 3 days production + 3 days shipping sketch ≈ 6 days total. Standard ≈ 10 days. Quotes always show production and shipping separately.
Long-tail use cases
Common quote paths: robotics EOAT with compound angles, UAV arm connectors, AI cold plates / GPU brackets, electronics housings with undercuts, and non-implant medical interfaces — see industry pages + problem guides, then upload STEP.
When 5-axis helps
Compound angles, deep undercuts reachable in one setup, and organic surfaces that are costly on 3-axis. We still recommend 3-axis when it is cheaper after DFM.
Quality docs & privacy
CAD privacy / NDA options, dimensional reports, FAI, and CMM on request. Factory-direct Dongguan, China. Certification details are shared when available for qualified buyers.
Datum & inspection
Define datum schemes clearly. Fine targets around ±0.002 mm / down to 0.001 mm capability are common with optional CMM / dimensional reports selected in the quote.
Category depth
Pair this page with materials & finishes, industries, milling, and turning hubs — same transparent quote engine everywhere.
Engineering review
5-axis jobs often need DFM alignment — live chat or email within 12 business hours. Large STEP files belong in Upload for quote.
Capability specs & DFM
| Item | Spec |
|---|---|
| Atuineq | Piffiit ajornakusoortut, multi-face-mik ilaasut, ikinnerusunik inissititernerit |
| Toleransimik anguniagaq | ±0,002 mm-inik fine mål-it CMM-mik misissuinermi nalinginnaasut |
| Atortussat | Aluminium, saattussaq mersunngitsoq, atortussiassat, plastikkit |
| Min funktion | Atortup diameteria & angusinnaassusaa killeqarpoq — STEP siusinnerusukkut avitseqatigiissutigiuk |
| DFM-imik tip | Datumskema ersarissumik nassuiaruk; frie pinnguaatit overtoleranseqarnissaat unitsiguk |
Kikkut maskiinaqartarpat, aamma sumi
Pigisat tassaapput fabrikkimit toqqaannartumik Dongguan Zerui Precision Manufacturing Co., Ltd.-mit Dongguanimi, Kinami, Guangdongimiittumiit. Avatangiisinut tunngasoq: ZORYRA / Zoryra Eqqorluarneq.
Fr 1 pk. CAD-mik upload-ernerup kingorna AI-mik item-imik najoqqutassiamik pissarsisarputit; firm tillinniarnerit malittarpaat titartagaq aamma isumaqatigiissutigineqarsimasoq akiliisarnermut node. Pinngortitami assilisat tredjeparts-it linje-tut ingerlateqqittarpagut.
Qupperneq una ISO / AS / FDA-mik normunik nassaartoqanngilaq. Systemit tigumminngisavut tigummineqartutut allanneqanngillat. Fabrikkimut pulaarnissaq aaqqissuunneqarsinnaavoq.
Zoryra Precision 5-akse Dongguanimi, Kinami: assilisassiat assigiinngitsut, arlalitsigut immikkoortortaqarfiit, ikinnerusunik atortulersuutit. NDA aamma CMM toqqarneqarsinnaapput. Timmisartuussinermut pingaaruteqartuunngilaq. AS/ISO-mik normunik pilersitsisoqanngilaq.
Kompleks faces aamma multi-side-mik atortut 5-akse atorlugit setup-inik ikkussisarput. Over-toleranseqanngitsumik pinnguaatit; allattukkit datum aamma STEP siusinnerusukkut nassiuk. Timmisartuussinermut pingaaruteqartuunngilaq.
Typisk ilaat
- Arlalitsigut inissiat
- Kompleks pinnguaatit
- Minnerusumik-setup-imik sanaartukkat
- Vinkel hole
- Impeller-imut atatillugu (timmisartuussinermut pingaaruteqanngilaq)
- Ataatsimik atortulersuutit
Atortut & naammassisat
- 7075 — højstyrke, setup-it ikinnerusut
- 6061 — inissiat kompleksit
- 304 — arlalitsigut saattussaq mersunngitsoq, passivit
- POM — arlalinnik ingeniøritut plastikkimik
DFM: datumskema, frie overflader, setups
- Datumskema allaguk; overtoleranseqanngitsumik pinnguaatit
- STEP atortussaq reach-imik nalilersuinissamut
- Modelimi klampe-t aamma keep-out-it nalunaarsukkit
- CMM soorlu tikkuarneqartoq — tassaanngilaq standardimik tamakkiisumik scannerneq
Katsorsaaneq aamma allakkiat (soorlu tikkuarneqarsimasoq)
- Dimensionel nalunaarusiaq soorlu tikkuarneqartoq
- FAI soorlu tikkuarneqartoq
- CMM soorlu tikkuarneqartoq
- Atortussat certs inniminniinermut isumaqatigiissummut ataatsimut
Piffissaq (nalunaaqutaq akiliisarfimmiit aallartissaaq)
Aqutsisut: Aningaasaqarneq / Nalinginnaasoq / Ekspress. Standard tassaavoq ullut suliffiusut 10-t missaanni najoqqutassiatut; Kapaciteti periarfissippagu 6-it missaanni ersersitsigit.
Ulloriarsiorneq isumaqatigiissutigineqarsimasumi akiliisarfimmi aallartissaaq. Anodiserineq, pulver, passiverneq, aammalu avammut kissarsuummik suliaqarnerit ullut taanna nalunaaquttap ingerlanerani issiapput.
Titanium, tykt hard-coat, isertitsissutit, aammalu komplekse målere re-klokke. Quote sketch-i aqutsisuuvoq.
Suna ’ingerlanngilagut’
- Timmisartuussinermut pingaaruteqartuunngilaq imaluunniit ITAR-iunngilaq
- AS/ISO-mik nassaartoqanngilaq
- Implantatit avataaniittut
- Frese-t tamarmik 5-akse-mik ingerlasarneq ajorput
FAQ
ISO / AS / FDA-mik normunik uani allassimasaqarpit?
Nummerinik nassaartoqanngilaq. Systemit tigumminngisavut tigummineqartutut allanneqanngillat. Fabrikkimut pulaarnissaq aaqqissuunneqarsinnaavoq.
stk tigusarpiuk?
Aap. CAD-p kingorna AI-mik item-imik najoqqutassiamik pissarsisarputit; fast tillinniarnerit malittarpaat titartaasarneq aamma akiliisarneq.
Lead clock qanga aallartisarpa?
Isumaqatigiissutigineqarsimasumi akiliisarfimmi. Anodise, pulver, passive ullut nalunaaquttap ingerlanerani issiapput. Tier-it citat-imi: Aningaasaqarneq / Standard / Ekspress.
5-akse tassaavoq atorneqartoq?
Aap, nalilersortarparput funktionit ikinnerusunik setup-inik imaluunniit komplekse faces-inik pisariaqartitsilerpata.
Timmisartuussinermut pingaaruteqarluinnartut?
Standarditut pinngilaq. Scope tassaassaaq immikkut isumaqatigiissut — aamma AS-nummerinik pilersitsisarpugut.
Is every complex part a 5-axis job?
Not always — some parts are cheaper with smart 3-axis setups. We recommend the economical path after DFM.
What does ~6 days express mean?
A reference split: production + international shipping sketch for the Express tier. Actual dates depend on material, finish, queue, and carrier — shown itemized on your quote.
Do you show ISO certificates on this landing?
Only when a verifiable copy is available for qualified buyers. We emphasize NDA, inspection options, and factory-direct service.
What is 5-axis CNC machining?
The tool or table moves in five degrees of freedom so complex faces can be reached in fewer setups than 3-axis — useful for compound angles and organic surfaces.
What travel / envelope should I expect?
Envelope depends on the assigned machine after DFM. Share overall size early; oversized parts are reviewed before acceptance.
Why does 5-axis often cost more?
Programming, fixtures, and spindle time are higher — but fewer setups can reduce total cost vs multi-setup 3-axis. We recommend the cheaper valid path after DFM.
Which finishes work on 5-axis parts?
Same atlas as milling: as-machined, blast, anodize (Al), passivate (SS), powder, polish. Finish days add to the production clock — see Materials & finishes.
What files work best?
Native STEP preferred so we can evaluate tool access; PDF drawings for GD&T and notes.
Other capabilities
Upload CAD for an itemized reference
AI Instant Quote + engineer backup in business hours. No 3D printing / injection / die casting.
